My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Opening of Proposals - Olive WTP Solar GESC Proj No 124-050 - Schneider Electric
sbend
>
Public
>
Public Works
>
Board of Works Documents
>
2024
>
Opening of Quotations/Proposals
>
Opening of Proposals - Olive WTP Solar GESC Proj No 124-050 - Schneider Electric
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/17/2025 2:38:52 PM
Creation date
12/11/2024 11:26:21 AM
Metadata
Fields
Template:
Board of Public Works
Document Type
Projects
Document Date
12/10/2024
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
87
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
A. Overview of M&V Plan, and Savings Calculation <br />B. Water/Sewer Water Savings Calculations <br />C. Key Parameter Measurement Strategy <br />D. Parameter Estimates <br />E. Cost Savings Calculations <br />A. Overview of M&V Plan, and Savings Calculation <br />Savings in this section are determined by using an "Option A: Retrofit Isolation — Key Parameter <br />Measurement' approach as described in the International Performance Measurement & Verification <br />Protocol (IPMVP Volume I, EVO 10000-1:2012). The remainder of this section describes the water <br />savings calculations, key parameter measurements that will be conducted, parameters that will be <br />estimated and those values, and how cost savings will be calculated. The water and cost savings that are <br />determined using this one-time measurement approach will be the annual savings values used for each <br />year of the Performance Period. <br />B. Water/Sewer Water Savings Calculations <br />Provided within this section is an explanation of the calculations that will be used to perform water/sewer <br />water savings calculations for this verification method. <br />Equations and Analysis of Water/Sewer Water Savings <br />Savings are calculated as the difference in total billed water consumption from the baseline conditions, <br />and the Performance Period conditions. The below equations will be used to determine savings for water <br />and sewer water. <br />The baseline billed water consumption is simply the water consumption billed each month across all <br />accounts during the period of September 2016 to August 2017. <br />The billed water consumption for the Performance Period is a calculated value to allow for a fair <br />comparison to the baseline conditions. To arrive at the Performance Period billed water consumption, the <br />first step is to compute the actual baseline water consumption from the billed baseline water consumption <br />and baseline water meter accuracy. A fair comparison of performance requires the Performance Period <br />actual consumption to be equal to this calculated actual baseline water consumption. The billed <br />consumption for the Performance Period is calculated similarly to the method used to determine the <br />actual baseline consumption but instead uses Performance Period water meter accuracy data. The <br />formulas below define this process. <br />Equation 1 — Billed Baseline Water Consumption <br />12 <br />H„ =IA <br />H <br />Where, <br />Hm = Billed annual baseline water consumption for account m <br />B; = Billed water consumption for calendar month i <br />Equation 2 — Actual Baseline Water Consumption <br />12 k I'. <br />C,,, = B; x _ <br />i=1 (jvj Aj <br />Where, <br />Cm = Actual annual baseline water consumption for account m <br />Pj = Percent of water consumption for flow rate category j <br />Aj = Baseline accuracy of water meter in flow category j <br />Energy Solutions Proprietary and Confidential <br />v102811 24 <br />
The URL can be used to link to this page
Your browser does not support the video tag.