My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Contract - Guaranteed Energy Savings Proj No 124-015 - Veregy
sbend
>
Public
>
Public Works
>
Board of Works Documents
>
2024
>
Agreements/Contracts/Proposals/Addenda
>
Contract - Guaranteed Energy Savings Proj No 124-015 - Veregy
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/10/2024 2:13:01 PM
Creation date
12/10/2024 2:12:38 PM
Metadata
Fields
Template:
Board of Public Works
Document Type
Permit Applications
Document Date
12/10/2024
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
76
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />1 <br /> <br />ARTICLE 1 <br /> <br />GENERAL PROVISIONS <br /> <br />1.1 This Agreement, including all Attachments, Exhibits, and Schedules referenced herein (hereinafter the <br />"Agreement") dated ___December 10th, 2024___ (the "Effective Date") by and between Veregy IN, LLC doing business as <br />“Veregy” (collectively referred to hereinafter “VEREGY”), with a principal place of business at 6406 Castleway Court, <br />Bldg. 37 Suite 100, Indianapolis, IN 46250 and (“CUSTOMER”) with a principal place of business at 227 West Jefferson <br />Blvd., South Bend, IN 46601. (collectively the "Parties"). <br /> <br />1.2 EXTENT OF AGREEMENT: This Agreement, including all attachments and exhibits hereto, represents the entire <br />agreement between CUSTOMER and VEREGY and supersedes all prior negotiations, representations or agreements. This <br />Agreement shall not be superseded by any provisions of the documents for construction and may be amended only by: (1) <br />a written amendment signed by both CUSTOMER and VEREGY; and (2) a Change Order. None of the provisions of this <br />Agreement shall be modified, altered, changed or voided by any subsequent Purchase Order issued by CUSTOMER, which <br />relates to the subject matter of this Agreement. <br /> <br />1.3 As used in this Agreement, the term “Work” means the construction and services required by the Contract <br />Documents, whether completed or partially completed, and includes all other labor, materials, equipment and services <br />provided or to be provided by VEREGY to fulfill VEREGY’s obligations, as described in Attachment A and otherwise set <br />forth in the Contract Documents. The Work may constitute the whole or a part of the Project. The Work specifically excludes <br />certain design and construction, which are the subject of separate agreements between CUSTOMER and parties other than <br />VEREGY. <br /> <br />1.4 The Project is the total construction of which the Work performed by VEREGY under this Agreement may be the <br />whole or a part and which may include construction by the CUSTOMER and by separate contractors. <br /> <br />1.5 The Contract Documents consist of this Agreement, its attachments, exhibits, schedules, and addenda and shall <br />include the Performance Bond and/or the Labor and Materials Payment Bond, as required by IC 4-13.6-7-6, IC 4-13.6-7-7 <br />and IC 36-112-5. The intent of the Contract Documents is to include all items necessary for the proper execution and <br />completion of the Work by VEREGY. The Contract Documents are complementary, and what is required by one shall be <br />binding as if required by all; performance by the Contractor shall be required only to the extent consistent with the Contract <br />Documents and reasonably inferable from them. <br /> <br />1.6 Installation Schedule means that schedule set out in Attachment B describing the Parties’ intentions respecting the <br />times by which the components or aspect of the Work therein set forth shall be installed and/or ready for acceptance or <br />beneficial use by CUSTOMER. <br /> <br />ARTICLE 2 <br /> <br />VEREGY'S RESPONSIBILITIES <br /> <br />2.1 VEREGY Services <br /> <br />2.1.1 VEREGY shall be responsible for construction of the Project, except as otherwise set forth in the Construction <br />Documents. <br /> <br />2.1.2 VEREGY shall secure permits necessary for the Work. <br /> <br />2.1.3 VEREGY shall not be required to provide professional services that constitute the practice of architecture or <br />engineering unless such services are specifically required by the Contract Documents for a portion of the Work or unless <br />VEREGY needs to provide such services in order to carry out VEREGY’s responsibilities for construction means, methods, <br />techniques, sequences and procedures. <br /> <br /> <br />2.2 Responsibilities with Respect to the Work <br />
The URL can be used to link to this page
Your browser does not support the video tag.