Laserfiche WebLink
<br />19 <br /> <br /> <br />Trees to be removed: <br /> <br /> <br /> <br />ECM 2 – HVAC Controls at Headworks and Administration Buildings <br /> <br />Replace Controls – Administration & Headworks Buildings <br />1. Replace the existing building control systems in the administration and headworks building with new DDC, Tridium <br />based control systems. The systems will be open protocol. The work only includes the building temperature control <br />systems and not the process control system (SCADA system). <br />a. Headworks Building <br />i. The existing control system in this building is a mix of pneumatic, electrical and DDC controls. <br />1. Demolition Work <br />a. Remove existing control panels including enclosures. <br />b. Remove pneumatic tubing and unused control wiring.