My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Contract - Guaranteed Energy Savings Proj No 124-015 - Veregy
sbend
>
Public
>
Public Works
>
Board of Works Documents
>
2024
>
Agreements/Contracts/Proposals/Addenda
>
Contract - Guaranteed Energy Savings Proj No 124-015 - Veregy
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/10/2024 2:13:01 PM
Creation date
12/10/2024 2:12:38 PM
Metadata
Fields
Template:
Board of Public Works
Document Type
Permit Applications
Document Date
12/10/2024
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
76
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
INTER-OFFICE MEMORANDUM <br /> DEPARTMENT OF PUBLIC WORKS <br />TO: Board of Public Works <br />FROM: Gemma Stanton, Project Engineer <br />SUBJECT: Guaranteed Energy Savings Contract with Veregy for South Bend <br />Wastewater Treatment Plant Solar and Energy Upgrades <br />DATE: 12/3/2024 <br />The Department of Engineering has been negotiating a Guaranteed Energy Savings Contract with <br />Veregy for the installation of a solar array and other energy conservation measures. The total cost <br />of the contract for installation is $2,267,831. Veregy will be responsible for Operations & <br />Maintenance for the first 5 years of the guarantee period. O&M will be invoiced annually starting in <br />the first Guarantee Year at $4,100 with a 2.5% annual escalation. <br />Scope <br />•Solar array – 300 kWac <br />•HVAC Control and Headworks & Administration Buildings <br />•LED Lighting at Administration building <br />•ACCU Unit at Headworks Building <br />•AC Unit at Dewatering Building office <br />Timeline <br />•Solar coordination and design: through May 2025 <br />•Lighting: March 2025 <br />•HVAC Control retrofits: May 2025 <br />•Solar construction: August-September 2025 <br />The M/WBE utilization plans are attached in this contract. The goals have been set by the Office of <br />Diversity & Inclusion. <br />Thank you for your consideration of this request. <br />Please call with your questions at extension 9083. <br />Enc. Guaranteed Energy Savings Contract , M/WBE Utilization Plans
The URL can be used to link to this page
Your browser does not support the video tag.