My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Amendment No. 2 to OEA - DTSB-ND Trail Proj No 122-040 - Abonmarche Constultants
sbend
>
Public
>
Public Works
>
Board of Works Documents
>
2024
>
Agreements/Contracts/Proposals/Addenda
>
Amendment No. 2 to OEA - DTSB-ND Trail Proj No 122-040 - Abonmarche Constultants
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/10/2024 2:12:34 PM
Creation date
12/10/2024 2:12:32 PM
Metadata
Fields
Template:
Board of Public Works
Document Type
Permit Applications
Document Date
12/10/2024
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
4
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Page 1 (Exhibit K – (Amendment to Owner-Engineer Agreement) – Attachment 1) <br />EJCDC E-500 Agreement Between Owner and Engineer for Professional Services. Copyright © 2008 National Society of Professional Engineers for EJCDC. All rights reserved. <br />This is EXHIBIT K, consisting of 2 pages, referred to in and part of the Agreement between Owner and Engineer for Professional Services dated September 12, 2023. AMENDMENT TO OWNER-ENGINEER AGREEMENT <br />Amendment No. 2 1.Background Data:a.Effective Date of Owner-Engineer Agreement:September 12, 2023 b.Owner:City of South Bend c.Engineer: Abonmarche Consultantsd.Project:Downtown South Bend to Notre Dame Trail 2.Description of Modifications: <br />a. The Scope of Services currently authorized to be performed by Engineer in <br />accordance with the Agreement and previous amendments, if any, is modified asfollows:•Coordinate with developer for addition of driveway approaches on west side <br />of Hill Street. Revise grading plans, plan and profile sheets, lighting, and <br />landscaping plans. <br />•Re-design of the sign foundations to include the sign base with the foundation. <br />Design of anchor bolts for foundation installed with LaSalle Street project <br />•Revise landscape plans per property owner requests and field modifications. <br />•Bicycle Trail discussions and plan changes <br />•Evaluation of existing retaining wall along the north side of South Bend <br />Avenue; Design plans for new retaining wall <br />b. For the Additional Services or the modifications to services set forth above, <br />Owner shall pay Engineer the following additional or modified compensation: <br />•Hill Street modifications: $2,400 <br />•Sign foundation re-design: $3,400 <br />•Notre Dame Avenue landscape plan revisions: $1,100 <br />•Bicycle Trail discussions and plan revisions: $1,400 <br />•Additional time necessary to attend meetings and respond to questions <br />throughout construction: $4,600 <br />•South Bend Avenue retaining wall design and plans: $6,900 <br />Total increase in contract amount: $19,800
The URL can be used to link to this page
Your browser does not support the video tag.