My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Change Order No. 2 - Cleveland Rd & Ameritech Dr. Improvements Proj No 122-049 - Milestone Contractors
sbend
>
Public
>
Public Works
>
Board of Works Documents
>
2024
>
Change Orders
>
Change Order No. 2 - Cleveland Rd & Ameritech Dr. Improvements Proj No 122-049 - Milestone Contractors
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/10/2024 2:09:31 PM
Creation date
12/10/2024 2:09:29 PM
Metadata
Fields
Template:
Board of Public Works
Document Type
Projects
Document Date
12/10/2024
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
5
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
112-049 Change Order #2 <br />Date Description QTY Unit Total <br />SUBTOTAL $45,655.94 <br />Final Underruns $ (14,167.35) <br />FINAL CO TOTAL $31,488.59 <br />Associated File <br />7/24/2024 HMA Patching Shoulder (Brick and Ameritech) 30.66 SYD $115.00 Added HMA shoulder repair at Brick and Ameritech.pdf <br />7/24/2024 Communication Lid Replacement Communication lid replacement.pdf <br />10/23/2024 Mobilization (Airmarking, Brick Rd)1 EA $2,864.50 $2,864.50 <br />Added line striping on Brick and Dylan (Airmarking)10/23/2024 Solid Yellow (Airmarking, Brick Rd)900 lft $0.58 $522.00 <br />10/23/2024 Solid White (Airmarking, Brick Rd)1170 lft $0.58 $678.60 <br />10/23/2024 Stop Bar (Airmarking, Brick Rd)30 lft $8.63 $258.90 <br />10/23/2024 Restocking Fee for trench drain Restocking Fee for Trench Drain.pdf <br />8/26/2024 Mobilization (NEW)1 EA $2,800.00 $2,800.00 <br />Dylan PRICE FOR RE INSTALL WIDENING.pdf <br />8/26/2024 #4 Excavation, Common 37 CYS $46.30 $1,713.10 <br />8/26/2024 #9 HMA Surface, PG70-22P, 9.5 mm, Type C 10.0 TON $320.00 $3,200.00 <br />8/26/2024 #11 HMA Base, PG 64-22, 25.0mm, Type C 40.5 TON $144.00 $5,832.00 <br />8/26/2024 #23 Curb, Concrete 135 LFT $98.00 $13,230.00 <br />8/26/2024 #25 Topsoil 6.7 CYS $470.00 $3,149.00 <br />8/26/2024 #53 Curb Remove 98 LFT $50.00 $4,900.00 <br />10/18/2024 NEW Seed Mobilization $450.00 $450.00 <br />10/18/2024 NEW Mulched Seeding 60 SYS $7.25 $435.00 <br />$3,525.90 <br />1 EA $1,108.24 $1,108.24 <br />1 EA $988.70 $988.70 <br />1 EA
The URL can be used to link to this page
Your browser does not support the video tag.