Laserfiche WebLink
6. Gateway Installation <br />The communication gateway installation must be done by an engineer, a technician, or a <br />qualified service agent. <br />6.1. Gateway Types <br />FLO uses Digi gateways, which are robust programmable wireless solutions. <br />6.2. Gateway Electrical Installation <br />We recommended installing the gateway on a separate power source from the charging <br />stations. This ensures that the gateway will still communicate with other charging stations <br />when a charging station is under maintenance. Each communication gateway requires a <br />120 VAC electrical outlet for its power supply to be plugged into. <br />6.3. Gateway Location <br />The communication gateway must be installed with the recommended specifications: <br />• Must be protected against the elements: <br />o Requires the installation of an electrical junction box to protect the <br />communication gateway. All installations require a junction box. See the 6.4. <br />Junction Boxsection for more information. <br />• Installed at a height of 8 to 12 feet (2.44 m to 3.66 m) above the ground, to be <br />accessible for maintenance but inaccessible to the public. <br />• Not installed on a charging station pedestal. <br />• Installed with the recommended distances to keep a good communication signal, as <br />mentioned in previous sections. <br />20 <br />