Laserfiche WebLink
BEFORE GETTING STARTED <br />! When unpackaging the Cable management system, make sure to remove the <br />security screw used to hold the counterweight during transport. <br />W i Installing on a new single charging station. <br />First, install the pedestal and the charging station. Refer to the pedestal <br />installation section. Then, install the Cable management system as indicated <br />below. If the pedestal is pre -drilled, use the 1/4-20 screws provided in the <br />package. Otherwise, use the drilling template and self -drilling screws also <br />included with the kit. Refer to the illustration on the former page to know where <br />to place the template on the pedestal, and mark the holes to drill. <br />i Installing on an existing single charging station. <br />Drill holes that will be used to install the mount bracket for the column with the Cable <br />management system and the empty column. Use the drilling template and the self -drilling <br />screws provided with the kit. Refer to the illustration on the former page to know where to place <br />the template on the pedestal, and mark the holes to drill. <br />Cable management <br />system installation <br />1. Install the rectangular spacing shim, place the column <br />and than install the upper mount bracket on top. <br />Screw parts loosely with'i4-20 or self -drilling screws, <br />depending on the type of pedestal you have, so the <br />Cable management system column is maintained in <br />place and moves freely to install the lower mounting <br />hardware. <br />Recommendation: To position the column, when <br />standing in front of the charging station, make sure to <br />place the output of the Cable management on the exterior <br />side. <br />2. Screw the column of the Cable management system <br />by placing the round spacing shim (circled in red in <br />the image included) between the pedestal and the <br />column, and tighten the screws to solidly secure the <br />column. <br />3. Secure the top bracket. <br />4. Install the empty column on the opposite side of the <br />charging station by following the above steps 1 to 3. <br />5. Proceed with the positioning of the cable clamp. Refer <br />to page 15. <br />6. Install the poster panel. Refer to page 16. <br />Caution : This pedestal is certified like an electrical enclosure, <br />and any alteration must comply with local regulation. <br />Mn <br />0 <br />CoRe+'" 9 <br />Cable management system and pedestal installation guide <br />