Laserfiche WebLink
<br />Version 3/15/2024 Page - 14 Public Works Quote <br /> <br />QUOTE/PROPOSAL <br />CITY OF SOUTH BEND <br />PROJECT NAME 2024 Installation of Electric Vehicle Supply Equipment (EVSE) <br />PROJECT NO. 124-052 <br />QUOTES DUE <br />December 10, 2024, by 9:00AM Local Time – electronic <br />quotes should be submitted to bpwbids@southbendin.gov <br /> <br />Division 1: Boland Park <br />Item <br />No. Description Quantity Unit Unit Price Total Amount <br />1 Flo CoRe+ L2 Charging Station <br />Installation 4 EA <br />2 Pedestal Installation 2 EA <br />3 Communication Gateway <br />Installation 1 EA <br />4 Pavement Striping, 4” Green 300 LFT <br />5 Pavement Striping, EVSE Symbol 4 EA <br />6 Signage Installation 4 EA <br />7 Concrete Sidewalk, 4” 1 SYD <br />8 Concrete Bollards 4 EA <br />Total Division 1 $ <br /> <br /> <br />Division 2: Veterans’ Memorial Park <br />Item <br />No. <br />Description Quantity Unit Unit Price Total Amount <br />1 Flo CoRe+ L2 Charging Station <br />Installation <br />4 EA <br />2 Pedestal Installation 2 EA <br />3 Communication Gateway <br />Installation 1 EA <br />4 Pavement Striping, 4” Green 120 LFT <br />5 Pavement Striping, EVSE Symbol 4 EA <br />6 Signage Installation 4 EA <br />7 Concrete Sidewalk, 4” 30 SYD <br />8 Concrete Bollards 4 EA <br />Total Division 2 $ <br />