My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Opening of Quotations - EVSE Installation Proj No 124-052 - Barnes Concepts
sbend
>
Public
>
Public Works
>
Board of Works Documents
>
2024
>
Opening of Quotations/Proposals
>
Opening of Quotations - EVSE Installation Proj No 124-052 - Barnes Concepts
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/17/2025 3:05:08 PM
Creation date
12/10/2024 2:03:30 PM
Metadata
Fields
Template:
Board of Public Works
Document Type
Projects
Document Date
12/10/2024
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
108
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
NOTE: The gateway start-up will automatically begin a few seconds later. <br />3. Validate that the green light indicators appear in the three to four following zones: <br />a. Signal strength: <br />• OFF: No (or a small amount of) cellular signal. <br />• Continuously yellow - amber: Adequate strength of the signal for most of <br />the applications - Fair. <br />• Continuously green: Good cellular signal and optimal position of the <br />communication gateway or master router. <br />b. Network/Service. <br />c. Xbee (Not applicable for the Master router) . <br />d. Power. <br />NOTE: If the signal strength LED indicator light is off, we recommend moving the device to a <br />better location. A weak signal can lead to unstable connections or a disconnection. <br />Contact FLO technical support for more recommendations. <br />7. Validation and Commissioning <br />Once the communication gateway is installed and working properly, activate the <br />commissioning. Contact the FLO support team at 1 877 505-2674. <br />24 <br />
The URL can be used to link to this page
Your browser does not support the video tag.