Laserfiche WebLink
BID/PROPOSAL <br />CITY OF SOUTH BEND <br />Project Name Byers Softball Complex Improvements Phase 1 <br />Project No. 123-072 <br />For Bids Due: December 10, 2024 <br />Contractor Name: PREMIUM CONCRETE SERVICES <br />BASE BID <br />No <br />Description <br />Quant, <br />Unit <br />Unit Price <br />Extension <br />1 <br />MOBILIZATION AND DEMOBILIZATION <br />1.00 <br />IS <br />$247,000 <br />$247,000 <br />2 <br />CLEARING RIGHT OF WAY <br />1.00 <br />LS <br />$76,500 <br />$76,500 <br />3 <br />EROSION CONTROL <br />1.00 <br />LS <br />$10,000 <br />$101000 <br />4 <br />TREE PROTECTION <br />1.00 <br />LS <br />$5,750 <br />$5,750 <br />5 <br />CURB, REMOVE <br />30.00 <br />LFT <br />$30 <br />$900 <br />6 <br />SIDEWALK, CONCRETE, REMOVE <br />338,00 <br />SYS <br />$30 <br />$10,140 <br />7 <br />PLAY EQUIPMENT, REMOVE <br />1.00 <br />LS <br />$12,200 <br />$12,200 <br />8 <br />EXCAVATION, COMMON <br />11230,00 <br />CYS <br />$112,50 <br />$138,375 <br />9 <br />COMPACTED AGGREGATE NO.53 <br />263.00 <br />TON <br />$67 <br />$17,621 <br />10 <br />HMA PATCHING FULL DEPTH, TYPE B <br />31.00 <br />TON <br />$240 <br />$7,440 <br />11 <br />PARKING LOT, CRACK SEALAND REPAIR <br />8,500.00 <br />SYS <br />$6 <br />$51,000 <br />12 <br />CURB, CONCRETE <br />30.00 <br />LFT <br />$85 <br />$2,550 <br />13 <br />CURB RAMP, CONCRETE <br />7.00 <br />SYS <br />$265 <br />$1,885 <br />14 <br />DETECTABLE WARNING SURFACES <br />1.20 <br />SYS <br />$355 <br />$426 <br />15 <br />SIDEWALK, CONCRETE, 4 IN. <br />241.00 <br />SYS <br />$108 <br />$26,028 <br />16 <br />SIDEWALK, CONCRETE, 6 IN. <br />768.00 <br />SYS <br />$116 <br />$89,088 <br />17 <br />SIDEWALK, CONCRETE, DECORATIVE <br />235.00 <br />LFT <br />$120 <br />$28,200 <br />Version 07/19/2023 Special Provisions - 7 <br />