My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
101 South Main Street_AA 2024-1014
sbend
>
Public
>
Historic Preservation
>
2024
>
December
>
Administrative Approvals
>
101 South Main Street_AA 2024-1014
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/14/2024 11:55:26 AM
Creation date
11/14/2024 11:55:38 AM
Metadata
Fields
Template:
South Bend HPC
HPC Street Address
101 South Main Street
HPC Document Type
Certification
HPC Local Landmark
i. South Bend
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
108
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Ludowici Interlocking Tile Installation Manual: Morando 14" & 16" <br />37www.ludowici.com <br />Hip Tiles <br />There are a number of methods to finish the hips of Inter- <br />locking tile roof depending on the design aesthetics <br />desired. These methods are flushed mitered, V-Hip tile or <br />one of Ludowici’s other trim groups. <br />Tiles to be installed at hips are field mitered. <br />V-Hip and Other Cap Type Hip Rolls <br />Hips are started with a special V-Hip Starter tile which <br />should cover the field tile approximately 3" on both sides. <br />The regular V-Hip tile is then installed by creating an ap- <br />proximate 2" head lap on the V-Hip starter tile. This 2" <br />head lap is continued up the hip and roofing cement is <br />applied at each hip tile’s overlap. The last fastener on the <br />upslope end of the hip is typically covered with a V-Hip <br />and Ridge Terminal. Some roof termination may require <br />a combination of typical flashing details or a special tile <br />piece. Consult the local Ludowici sales representative for <br />the project’s special roof requirements. <br />Figure 39.1 V-Hip Detail <br />Foundation Grade Hip Stringer <br />Board, See Page 15 for Sizing <br />Instructions <br />18" Strip of Ice and Water Shield <br />Hip Tiles Field Mitered Spaced <br />1/4" from Hip Stringer. <br />For Small Pieces Use Nail and <br />Wire and Apply a 1" Dia. Dab of <br />Roofing Cement to Small Pieces <br />to Prevent Migration <br />Gap Between Hip Tile and <br />Stringer Filled With Roofing <br />Cement or Sealant <br />Compatible with Ice and <br />Water Shield <br />V-Hip Tile Laid With a 2" Lap <br />Bead of Sealant Between the Lap of <br />V-Hip Tiles <br />V-Hip Starter <br />Roof Pitch <br />Rise:Run <br />V-Hip 118 Hip 102 Hip CC Hip <br />4:12 2 1/4"2 7/8"4 3/4"2 1/4" <br />5:12 2 1/4"2 7/8"4 5/8"2 1/4" <br />6:12 2"2 7/8"4 5/8"2" <br />7:12 2"2 3/4"4 1/2"2" <br />8:12 1 3/4"2 3/4"4 1/2"1 3/4" <br />9:12 1 3/4"2 3/4"4 3/8"1 3/4" <br />10:12 1 1/2"2 5/8"4 3/8"1 1/2" <br />11:12 1 1/2"2 5/8"4 1/4"1 1/2" <br />12:12 1 1/4"2 5/8"4 1/4"1 1/4" <br />13:12 1 1/4"2 5/8"4 1/8"1 1/4" <br />14:12 1 1/4"2 5/8"4 1/8"1 1/4" <br />Chart 39.1
The URL can be used to link to this page
Your browser does not support the video tag.