Laserfiche WebLink
Ludowici Interlocking Tile Installation Manual: Lexington Slate & Century Shake <br />66 www.ludowici.com <br />Mitered Hip <br />A flush mitered hip can be done by accurately miter- <br />cutting the field tile and sealing the finished joint with <br />an approved sealant, meeting the requirements of <br />ASTM D-4586. Mitred hips require the use of copper <br />step flashing on every course. <br />18" Strip of Ice and <br />Water Shield <br />16 oz. Copper Step Flashing With <br />1/4" Lip at Each Course Set in <br />a Thin Bed of Roofing Cement <br />With 2 Copper Roofing Nails at <br />Top <br />Field Cut Mitred Hip Tiles <br />and Set in a Thin Bed of <br />Roofing Cement <br />Apply a Bead of Sealant to <br />Hip Joint Between Tiles <br />Figure 66.1 Mitred Hip Detail <br />Roof Pitch <br />Rise:Run <br />Century/Lexington <br />V-Ridge <br />4:12 1 1/4" <br />5:12 1" <br />6:12 13/16" <br />7:12 9/16" <br />8:12 3/8" <br />9:12 1/4" <br />10:12 3/16" <br />11:12 9/16" <br />12:12 7/16" <br />13:12 1/4" <br />14:12 1/8" <br />Chart 66.1