My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1203 East Wayne Street South_AA 2024-1105
sbend
>
Public
>
Historic Preservation
>
2024
>
November
>
Administrative Approvals
>
1203 East Wayne Street South_AA 2024-1105
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/13/2024 10:30:53 AM
Creation date
11/13/2024 10:32:00 AM
Metadata
Fields
Template:
South Bend HPC
HPC Street Address
1203 East Wayne Street South
HPC Document Type
Certification
HPC Local Historic District
viii. East Wayne Street
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
29
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Prepared by <br />Report summary <br />1203 East Wayne Street South, South Bend, IN 46615 <br />Measurements <br />Total roof area 2754 sqft <br />Total pitched area 2722 sqft <br />Total flat area 32 sqft <br />Total roof facets 15 facets <br />Predominant pitch 12/12 <br />Total eaves 152ft 9in <br />Total valleys 75ft 6in <br />Total hips 14ft 8in <br />Total ridges 89ft 9in <br />Total rakes 185ft 7in <br />Total wall flashing 16ft 7in <br />Total step flashing 45ft 3in <br />Total transitions 25ft 1in <br />Total parapet wall 0ft 0in <br />Total unspecified 58ft 4in <br />Hips + ridges 104ft 5in <br />Eaves + rakes 338ft 3in <br />Pitch 0/12 5/12 8/12 12/12 <br />Area (sqft)33 30 115 2,579 <br />Squares 0.4 0.3 1.2 25.8 <br />Recommended <br />Waste %0%10%12%15%17%20%22% <br />Area (sqft)2,755 3,030 3,086 3,168 3,223 3,306 3,361 <br />Squares 27.6 30.3 30.9 31.7 32.3 33.1 33.7 <br />Recommended waste is based on an asphalt shingle roof with a closed valley system (if applicable). Several other factors are involved <br />in determining which waste percentage to use, including the complexity of the roof and individual roof application style. You will also <br />need to calculate the post-waste quantity of other materials needed (hip and ridge caps, starter shingle, etc.). <br />This report was prepared by Roofr. Copyright © 2024 Roofr.com | All rights reserved.6
The URL can be used to link to this page
Your browser does not support the video tag.