Laserfiche WebLink
• upon award of contract, WCRI shall provide the owner with a full coverage <br />certificate of insurance for their files. <br />• This proposal is based upon normal working hours and free access to the roof <br />surface and roof edge along the back guttering. Additionally, space shall be <br />available for material storage onsite. <br />• Payment shall be made in full to WCRI within 30 days if completion and issuance <br />to the owner of the Manufacturers Water -tight Warranty. <br />• No plumbing, electrical, mechanical work is included in this quotation- we do not <br />believe any would be required, but sometimes re -roofing operations reveal <br />hidden conditions that may have to be addressed. <br />• WCRI is not responsible for any damage to lawn, trees, shrubs, sidewalks, curbs <br />that may appear through normal construction operations. If damages occur due <br />to WCRI negligence, WCRI would be liable for resulting damages. <br />