My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Opening of Quotations - 2024 EVSE Installation Proj No. 124-052 - Barnes Concepts
sbend
>
Public
>
Public Works
>
Board of Works Documents
>
2024
>
Opening of Quotations/Proposals
>
Opening of Quotations - 2024 EVSE Installation Proj No. 124-052 - Barnes Concepts
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/17/2025 3:03:27 PM
Creation date
11/12/2024 3:43:52 PM
Metadata
Fields
Template:
Board of Public Works
Document Type
Projects
Document Date
11/12/2024
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
139
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Cable management <br />system installation <br />1. First, install one of the two spacing shims and the <br />lower wall mount bracket at the desired height by <br />using two 'ia in diameter screws and appropriate <br />washer. Make sure that both brackets are levelled <br />horizontally. <br />Remark: The lower wall mount bracket can be identified <br />by its factory pre -drilled holes. <br />2. Sit the column in the lower wall mount bracket. <br />Remark: Make sure to position the Cable management <br />system's cable clamp on the correct side, that is on the <br />right or the left, according to where the charging station is <br />located. <br />3. Secure the column by installing the screw and bolt in <br />the lower wall mount bracket thought the pre drilled <br />holes with a ratchet wrench and an axel nut socket <br />(the security screw that was used for holding the <br />counterweight). <br />4. Install the top bracket and the rectangular spacing <br />shim while inserting the column between the parts. <br />Once you ensure that the bracket is flush with <br />the plate and assembly is level, secure it with the <br />appropriate screws (according to wall type). <br />5. Verify the column's angle with a level. <br />6. Proceed with the positioning of the cable clamp. Refer <br />to page 15. <br />7. Pull on the Cable management system's cable a few <br />times to ensure that all parts are moving freely. <br />CoRe+'" I <br />7 <br />Cable management system and pedestal installation guide <br />
The URL can be used to link to this page
Your browser does not support the video tag.