Laserfiche WebLink
<br />Version 3/15/2024 Page - 24 Public Works Quote <br /> <br />Division 3: Veterans’ Memorial Park <br />Item <br />No. <br />Description Quantity Unit Unit Price Total Amount <br />1 Flo CoRe+ L2 Charging Station <br />Installation <br />4 EA <br />2 Pedestal Installation 2 EA <br />3 Communication Gateway <br />Installation 1 EA <br />4 Pavement Striping, 4” Green 120 LFT <br />5 Pavement Striping, EVSE Symbol 4 EA <br />6 Signage Installation 4 EA <br />7 Concrete Sidewalk, 4” 30 SYD <br />8 Concrete Bollards 4 EA <br />Total Division 3 $ <br /> <br />Division 4: Restriping Existing EV Parking Spaces <br />Item <br />No. <br />Description Quantity Unit Unit Price Total Amount <br />1 Pavement Striping, 4” Green 616 LFT <br />2 Pavement Striping, EVSE Symbol 8 EA <br />Total Division 4 $ <br /> <br /> <br />SUMMARY <br />Location <br /> <br />Amount <br /> <br />Division 1: Boland Park <br /> <br /> <br />Division 2: Pinhook Park <br /> <br /> <br />Division 3: Veterans’ Memorial Park <br /> <br /> <br />Division 4: Restriping Existing EV Parking Spaces <br /> <br /> <br />Total <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br />