My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Opening of Quotes - 2024 Electric Vehicle Supply Equipment Proj No. 124-052 - No bids recieved
sbend
>
Public
>
Public Works
>
Board of Works Documents
>
2024
>
Opening of Quotations/Proposals
>
Opening of Quotes - 2024 Electric Vehicle Supply Equipment Proj No. 124-052 - No bids recieved
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/17/2025 3:11:56 PM
Creation date
10/22/2024 2:24:41 PM
Metadata
Fields
Template:
Board of Public Works
Document Type
Projects
Document Date
10/22/2024
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
133
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Before getting started <br />• Determine where the wall mount (column) MI be placed. Allow 12 to <br />14 in between the column and the charging station. <br />• Determine what wall attachment hardware is required (wall anchors, <br />screws and washers) to securely install the mount brackets to the <br />wall. Use 'i4 in diameter screws and anchors of the appropriate size, if <br />the screws cannot be secured directly in a wall stud. <br />Recommendations : Install the column at least 6 in from the ground <br />(allow enough clearance to facilitate floor cleaning). The upper wall mount <br />bracket should be installed at least 60 in above the lower wall mount <br />bracket. <br />60 in <br />6 in <br />Floor <br />CoRe+T" 6 <br />Cable management system and pedestal installation guide <br />
The URL can be used to link to this page
Your browser does not support the video tag.