My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Opening of Quotes - 2024 Electric Vehicle Supply Equipment Proj No. 124-052 - No bids recieved
sbend
>
Public
>
Public Works
>
Board of Works Documents
>
2024
>
Opening of Quotations/Proposals
>
Opening of Quotes - 2024 Electric Vehicle Supply Equipment Proj No. 124-052 - No bids recieved
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/22/2024 2:25:32 PM
Creation date
10/22/2024 2:24:41 PM
Metadata
Fields
Template:
Board of Public Works
Document Type
Projects
Document Date
10/22/2024
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
133
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />Version 3/15/2024 Page - 3 Public Works Quote <br /> <br />A. Prevailing Specifications: 2024, INDOT Standard Specifications Section 107 <br />B. Additions: <br />1. The Engineer, where mentioned in these documents, is City of South Bend, Public Works and <br />Utilities. <br />2. The Contractor shall apply for and obtain any and all required permits for the work from local, state, <br />and federal agencies and shall comply with permit requirements, including the St. Joseph County <br />/ City of South Bend Building Department. <br />3. If the Contractor awarded this contract is not a resident of Indiana, within thirty days, the Contractor <br />shall provide the Owner with proof that the Contractor is duly licensed, qualified and registered with <br />the Secretary of State of Indiana to engage in business within the State of Indiana. <br />4. The Contractor shall comply with all provisions of Indiana Code 5-16-13, as amended. The Owner <br />reserves the right to immediately terminate the public work project awarded should the Contractor <br />be found to be in violation of any provision of Indiana Code 5-16-13 and such violation shall result <br />in the forfeiture of Contractor’s performance bond to the Owner. <br />5. An awarded contract may be amended only by separate writing, signed by authorized <br />representatives of both the Contractor and the City. An awarded contract will be construed and <br />interpreted according to the laws of the State of Indiana without regard to conflicts of laws statutes. <br />Any dispute arising under the terms of the awarded contract shall be filed in any court of competent <br />jurisdiction in St. Joseph County, Indiana. <br /> <br />XI. PROSECUTION AND PROGRESS <br /> <br />A. Prevailing Specifications: 2024, INDOT Standard Specifications Sec. 108 <br />B. Additions: <br /> <br />1. The Project will have a completion date of 90 days after Notice to Proceed. The Contract Time <br />will start when the Notice to Proceed is delivered and signed. <br />2. The City, Engineer, and Contractor will hold a pre-construction meeting following award of the <br />contract. The date of the Notice to Proceed will be agreed at that meeting. <br />3. Contractor shall provide a schedule to the Owner prior to beginning any work on the site. <br />4. The Contractor shall utilize the City of South Bend selected project management software for <br />reporting of all activities related to the contracted work. <br /> <br /> <br />XII. CHANGE OF CONTRACT TIME <br /> <br />A. Prevailing Specifications: 2024, INDOT Standard Specifications Section 108 <br />B. Additions <br /> <br />1. The Contract Time may only be changed by Change Order. Any Claim for an extension in the <br />Contract Time shall be based on written notice delivered to the Department of Public Works within <br />seven (7) calendar days of the occurrence of the event giving rise to the claim. Notice of the extent <br />of the claim with supporting data shall be delivered within fourteen (14) calendar days after such <br />occurrence unless an official of the Public Works Department allows an additional period of time to <br />ascertain more accurate data. The Contract Time will be extended in an amount equal to time lost <br />to delays beyond the control of the Contractor if a claim is made in accordance with this provision. <br />Such delays shall include acts of neglect by the Public Works employees, or to fires, flood, labor <br />disputes, epidemics, abnormal weather conditions, governmental procedures, or acts of God. <br />2. Unless otherwise provided, the Contract time is based upon normal weather conditions. An <br />extension is granted for weather conditions significantly more severe than normal if the Contractor <br />demonstrates to the satisfaction of the City that the delay in the progress of the work was due to <br />such weather. The basis to define normal weather with be the data compiled by the United States <br />Department of Commerce, National Oceanic and Atmospheric Administration (NOAA). <br />3. No extension of time will be granted if the Contractor, by his/her/its own action or inaction, including <br />fault or negligence of Contractor’s subcontractors, caused the delay, or for which any remedies are <br />provided under any other provision of this agreement. <br />4. The grant of an extension of time under this Section in no way constitutes a waiver by the City of <br />any rights or remedies existing under this contract at law or in equity.
The URL can be used to link to this page
Your browser does not support the video tag.