My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Opening of Quotes - 2024 Electric Vehicle Supply Equipment Proj No. 124-052 - No bids recieved
sbend
>
Public
>
Public Works
>
Board of Works Documents
>
2024
>
Opening of Quotations/Proposals
>
Opening of Quotes - 2024 Electric Vehicle Supply Equipment Proj No. 124-052 - No bids recieved
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/17/2025 3:11:56 PM
Creation date
10/22/2024 2:24:41 PM
Metadata
Fields
Template:
Board of Public Works
Document Type
Projects
Document Date
10/22/2024
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
133
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
� 4SpUTH 8E�0 <br />QUOTE/PROPOSAL W �`� PEACE �b <br />CITY OF SOUTH BEND x X <br />1865 <br />PROJECT NAME 2024 Installation of Electric Vehicle Supply Equipment (EVSE) <br />PROJECT NO. 124-052 <br />October 22, 2024, by 9:OOAM Local Time - electronic quotes <br />QUOTES DUE should be submitted to bpwbids(a)southbend in.gov <br />Division 1: Boland Park <br />Item <br />No. <br />Description <br />Quantit <br />y <br />Unit <br />Unit Price <br />Total Amount <br />1 <br />Flo CoRe+ L2 Charging Station <br />Installation <br />4 <br />EA <br />2 <br />Pedestal Installation <br />2 <br />EA <br />3 <br />Communication Gateway <br />Installation <br />1 <br />EA <br />4 <br />Pavement Striping, 4" Green <br />300 <br />LFT <br />5 <br />Pavement Striping, EVSE Symbol <br />4 <br />EA <br />6 <br />Signage Installation <br />4 <br />EA <br />7 <br />Concrete Sidewalk, 4" <br />1 <br />SYD <br />8 <br />Concrete Bollards <br />4 <br />EA <br />Total Division 1 <br />$ <br />Division 2: Pinhook Park <br />Item <br />No. <br />Description <br />Quantity <br />Unit <br />Unit Price <br />Total Amount <br />1 <br />Flo CoRe+ L2 Charging Station <br />Installation <br />4 <br />EA <br />2 <br />Pedestal Installation <br />2 <br />EA <br />3 <br />Communication Gateway <br />Installation <br />1 <br />EA <br />4 <br />TESCO Box Service Connection <br />1 <br />EA <br />5 <br />Pavement Striping, 4" Green <br />120 <br />LFT <br />6 <br />Pavement Striping, EVSE Symbol <br />4 <br />EA <br />7 <br />Signage Installation <br />4 <br />EA <br />8 <br />Concrete Sidewalk, 4" <br />10 <br />SYD <br />9 <br />Concrete Bollards <br />4 <br />EA <br />Total Division 2 <br />$ <br />Version 3/15/2024 Page - 23 Public Works Quote <br />
The URL can be used to link to this page
Your browser does not support the video tag.