My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PSA - On-Call Design - McCormick Engineering LLC
sbend
>
Public
>
Public Works
>
Board of Works Documents
>
2024
>
Agreements/Contracts/Proposals/Addenda
>
PSA - On-Call Design - McCormick Engineering LLC
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/22/2024 2:18:11 PM
Creation date
10/22/2024 2:17:53 PM
Metadata
Fields
Template:
Board of Public Works
Document Type
Projects
Document Date
10/22/2024
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
54
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br /> Page 1 <br />EJCDC E-500 Agreement Between Owner and Engineer for Professional Services <br />Copyright © 2008 National Society of Professional Engineers for EJCDC. All rights reserved. <br /> <br /> <br />AGREEMENT <br />BETWEEN OWNER AND ENGINEER <br />FOR <br />PROFESSIONAL SERVICES <br /> <br /> <br />Owner and Engineer further agree as follows: <br />ARTICLE 1 – SERVICES OF ENGINEER <br />1.01 Scope <br />A. Engineer shall provide, or cause to be provided, the services set forth herein and in Exhibit A. <br />ARTICLE 2 – OWNER’S RESPONSIBILITIES <br />2.01 General <br />A. Owner shall have the responsibilities set forth herein and in Exhibit B. <br />B. Owner shall pay Engineer as set forth in Exhibit C. <br /> THIS IS AN AGREEMENT effective as of Oct 22 , 2024 (“Effective Date”) between <br /> <br />Board of Public Works, City of South Bend, Indiana (“Owner”) and <br /> <br />McCormick Engineering, LLC (“Engineer”). <br /> <br />Owner's Project, of which Engineer's services under this Agreement are a part, is generally identified as <br />follows: <br />2025 Stormwater On-Call Services ("Project"). <br />Engineer's services under this Agreement are generally identified as follows: <br />● Prepare Design for Drainage Improvements at the northwest corner of the intersection of Harrow <br />Drive and Hampshire Drive <br />● Prepare as-needed drainage study support and preliminary design services related to improvements to <br />the existing Calvert Basin facility along Calvert Street <br />● Preparation of a drainage study for Storm Sewer Separation Improvements near the intersection of <br />Pershing Street and Huey Street <br />
The URL can be used to link to this page
Your browser does not support the video tag.