My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PSA - On-Call Design - McCormick Engineering LLC
sbend
>
Public
>
Public Works
>
Board of Works Documents
>
2024
>
Agreements/Contracts/Proposals/Addenda
>
PSA - On-Call Design - McCormick Engineering LLC
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/22/2024 2:18:11 PM
Creation date
10/22/2024 2:17:53 PM
Metadata
Fields
Template:
Board of Public Works
Document Type
Projects
Document Date
10/22/2024
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
54
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br /> <br />Page 8 <br />(Exhibit A – Engineer’s Services) <br />EJCDC E-500 Agreement Between Owner and Engineer for Professional Services <br />Copyright © 2008 National Society of Professional Engineers for EJCDC. All rights reserved. <br /> <br />and transmit the annotated record documents which are to be assembled by Contractor in <br />accordance with the Contract Documents to obtain final payment. The extent of such review <br />by Engineer will be limited as provided in Paragraph A1.05.A.11. <br />17. Substantial Completion: Promptly after notice from Contractor that Contractor considers the <br />entire Work ready for its intended use, in company with Owner and Contractor, visit the <br />Project to determine if the Work is substantially complete. If after considering any objections <br />of Owner, Engineer considers the Work substantially complete, Engineer shall deliver a <br />certificate of Substantial Completion to Owner and Contractor. <br />18. Additional Tasks: Perform or provide the following additional Construction Phase tasks or <br />deliverables: [here list any such tasks or deliverables]. <br />19. Final Notice of Acceptability of the Work: Conduct a final visit to the Project to determine <br />if the completed Work of Contractor is acceptable so that Engineer may recommend, in <br />writing, final payment to Contractor. Accompanying the recommendation for final payment, <br />Engineer shall also provide a notice in the form attached hereto as Exhibit E (the “Notice of <br />Acceptability of Work”) that the Work is acceptable (subject to the provisions of Paragraph <br />A1.05.A.15.b) to the best of Engineer’s knowledge, information, and belief and based on the <br />extent of the services provided by Engineer under this Agreement. <br />B. Duration of Construction Phase: The Construction Phase will commence with the execution of the <br />first Construction Contract for the Project or any part thereof and will terminate upon written <br />recommendation by Engineer for final payment to Contractors. If the Project involves more than <br />one prime contract as indicated in Paragraph A1.03.C, then Construction Phase services may be <br />rendered at different times in respect to the separate contracts. Subject to the provisions of Article <br />3, Engineer shall be entitled to an equitable increase in compensation if Construction Phase services <br />(including Resident Project Representative services, if any) are required after the original date for <br />completion and readiness for final payment of Contractor as set forth in the Construction Contract. <br />C. Limitation of Responsibilities: Engineer shall not be responsible for the acts or omissions of any <br />Contractor, Subcontractor or Supplier, or other individuals or entities performing or furnishing any <br />of the Work, for safety or security at the Site, or for safety precautions and programs incident to <br />Contractor's Work, during the Construction Phase or otherwise. Engineer shall not be responsible <br />for the failure of any Contractor to perform or furnish the Work in accordance with the Contract <br />Documents. <br />A1.06 Post-Construction Phase <br />A. Upon written authorization from Owner during the Post-Construction Phase Engineer shall: <br />1. Together with Owner, visit the Project to observe any apparent defects in the Work, assist <br />Owner in consultations and discussions with Contractor concerning correction of any such <br />defects, and make recommendations as to replacement or correction of defective Work, if <br />any.
The URL can be used to link to this page
Your browser does not support the video tag.