Laserfiche WebLink
<br /> <br />Page 1 <br />(Exhibit A – Engineer’s Services) <br />EJCDC E-500 Agreement Between Owner and Engineer for Professional Services <br />Copyright © 2008 National Society of Professional Engineers for EJCDC. All rights reserved. <br /> <br />This is EXHIBIT A, consisting of 14 pages, referred to in <br />and part of the Agreement between Owner and Engineer <br />for Professional Services dated October 22, 2024. <br />Engineer’s Services <br /> <br />Article 1 of the Agreement is supplemented to include the following agreement of the parties. <br /> <br />Engineer shall provide Basic and Additional Services as set forth below. <br /> <br />PART 1 – BASIC SERVICES <br />A1.01 Study and Report Phase <br />A. Engineer shall: <br />1. Consult with Owner to define and clarify Owner’s requirements for the Project and available <br />data. <br />2. Advise Owner of any need for Owner to provide data or services of the types described in <br />Exhibit B which are not part of Engineer’s Basic Services. <br />3. Identify, consult with, and analyze requirements of governmental authorities having <br />jurisdiction to approve the portions of the Project designed or specified by Engineer, <br />including but not limited to mitigating measures identified in the environmental assessment. <br />4. Identify and evaluate [one] alternate solutions available to Owner and, after consultation with <br />Owner, recommend to Owner those solutions which in Engineer’s judgment meet Owner’s <br />requirements for the Project. <br />5. Prepare a report (the “Report”) which will, as appropriate, contain schematic layouts, <br />sketches, and conceptual design criteria with appropriate exhibits to indicate the agreed-to <br />requirements, considerations involved, and those alternate solutions available to Owner <br />which Engineer recommends. For each recommended solution Engineer will provide the <br />following, which will be separately itemized: opinion of probable Construction Cost; <br />proposed allowances for contingencies; the estimated total costs of design, professional, and <br />related services to be provided by Engineer and its Consultants; and, on the basis of <br />information furnished by Owner, a summary of allowances for other items and services <br />included within the definition of Total Project Costs. <br />6. Perform or provide the following additional Study and Report Phase tasks or deliverables: <br />[provide a schematic drawing of proposed additional storm pipes or outfall improvements ] <br />7. Furnish 2 review copies of the Report and any other deliverables to Owner <br />within 90 calendar days of the Effective Date and review it with Owner. <br />Within 30 calendar days of receipt, Owner shall submit to Engineer any comments <br />regarding the Report and any other deliverables.