Laserfiche WebLink
EXHIBIT A <br />DEDICATED IMPROVEMENTS <br />St. Joseph County/South Bend <br />"C" Store Retail Building <br />Victoria Street Right of Way Construction Estimate <br />June 11, 2024 <br />A. Right of Way Work <br />DescriplioJ <br />Qrranti Unit <br />Unit Price Cost <br />1. Common Excavation <br />250 CYD <br />$20.00 <br />$5,000 <br />2. Tree, Remove <br />4 EA <br />$1,500.00 <br />$6,000 <br />3. Concrete Curb, Remove <br />105 LFt <br />$15.00 <br />$1,575 <br />4. Compacted Aggregate, No. 53 <br />245 TON <br />$40.00 <br />$9,800 <br />5. HMA Surface, 165 Ib/syd <br />60 TON <br />$110.00 <br />$6,600 <br />6. HMA Intermediate, 275lb/syd <br />95 TON <br />$105.00 <br />$9,975 <br />7. HMA Base, 440 Ib/syd <br />150 TON <br />$90.00 <br />$13,500 <br />8. Concrete Sidewalk, 4" <br />60 SYD <br />$65.00 <br />S3,900 <br />9. Concrete Curb <br />215 LIFT <br />$40.00 <br />S8,600 <br />10. PCCP, 8" <br />56 SYD <br />$120.00 <br />$6,720 <br />11. Mulched Seeding, Type U <br />125 SYD <br />$3.00 <br />$375 <br />12. Storm Sewer Inlet, 30" <br />1 EA <br />$4,000.00 <br />$4,000 <br />13. Storm Sewer Manhole, 48" <br />2 EA <br />$5,500.00 <br />$11,000 <br />14. Storm Sewer Pipe, 12" <br />220 LFT <br />$55.00 <br />$12,100 <br />15. Connect to Structure <br />1 EA <br />$1,000.00 <br />$1,000 <br />Subtotal <br />$100,145 <br />Contingency <br />25% <br />$25,036 <br />TOTAL: $126,000 <br />