My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1345 East Wayne Street_AA 2024-0910-1
sbend
>
Public
>
Historic Preservation
>
2024
>
October
>
Administrative Approvals
>
1345 East Wayne Street_AA 2024-0910-1
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/15/2024 4:41:03 PM
Creation date
10/15/2024 4:41:26 PM
Metadata
Fields
Template:
South Bend HPC
HPC Document Type
Certification
HPC Local Historic District
viii. East Wayne Street
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
23
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
rr.10k .Wr.M <br />SOUTH <br />0 I IM <br />` R00F1el :! m- <br />SIDING—= WINED0`AJ [-�C-7. <br />- ---- EST-1914 - --- <br />574-288-4764 ll <br />574-288-4766 A <br />sales@southhendroofing.Gom ED <br />www,southbendroofing.corn E;l <br />1-I35 1,A1. kNrni shington St., South Bend, IN 46601 0 <br />The undersigned property owner(s), hereinafter called the "Owner," does hereby contract and authorize the undersigned South Bend Roofing & <br />Siding Company, Inc., hereinafter called the "Contractor," to furnish the necessary materials and labor to install the improvements listed below, subject to <br />the following terms and conditions, an the premises located at: <br />PROJECT ADDRESS 1345 E Wayne St., South Bend, IN Contract Date: 1/16/24 <br />IMPROVEMENT SPECIFICATIONS* <br />SCOPE — Garage & 2-Story Section Fascia/Soffit/dormers/Gutter <br />Fascia, Soffit, Dormer Wraps: <br />1. Remove existing gutter and prep areas for new materials. <br />2. Any unforeseen conditions such as, but not limited to, wood or framing replacement after tear -off will be performed on a <br />time & material cost basis only after notifying owner of conditions. <br />1 Install new aluminum vented soffit In matching color to soffit areas. <br />4. Install new aluminum fascia in matching color to all fascia areas. <br />5. At all 8 dormers on second story section, fully wrap dormers with new aluminum wrapping to cover existing wood. <br />TOTAL JOB = $7,996 <br />Gutter & Downspaut Replacement: <br />1. Instal! r ew-5"-seamless gutter complete with mitered corners and hidden hangers. <br />2. Install all new 20 downspouts in same locations as existing downspouts. <br />3, All gutter and downspout will be installed in same color as existing/previously installed gutter section. <br />4. Includes all necessary accessories for a full Installation. <br />TOTAL.JOB = $3,273 <br />PERMIT INCLUDED. NO DOWN PAYMENT REQUIRED. PAYMENT IN FULL UPON COMPLETION. <br />I)ue to current market volatility: It there Is on incre a se In the acleaI cost of the Iabar or materials charged to the Contractor In excess of 2-5%subsequent to making this Agreement, the price set forth in this Agreement shall be <br />increase d with out the need far a wri tten change and er of amendment to the co ntra ct to reflect the prIca Increase and addil io n at direct cc sl to the Co n trwn or, Cc n t ra cl or wi I submit vveil ten d ocu meal a tl on of the incr e a sed <br />Charges to Ilie Owner upon request- As an addit Ianal remedy, if the actual cost a any line it ern Increases mora than 1C%subseque nt to the making a F I h i s Ali reem en t. Contractor, at Its sole discre Han, may teen I nave the <br />contract for convenience. <br />Terms: Contract Price See Above Sales Tax Included Down Payment NONE with 100% due upon completion <br />Acceptance of this contract must be made on or before: Approximate Start Date: Will Call to Schedule <br />This ronl ractor carries in su ra rice ror aublic Iiabi Iily, property da nl age and workmen's corn pe nsal Ion. The Conl ra c for agrees to re move all waste materials Irunt the pre rni5ea upon co rnplelion of the wa rk, All surplus <br />mn IenaI remains the property of the Cant ractor. All material warranties are lh ose We cifled by the man u rac nrrer fu mis hi rig the mat erials. l r the customer does not have a so tlsfa story cred i t ra t in g, this contract may Ile ca ncel led by the <br />Contra[to r- Th is Can t ra ct shall not ba bl riding on the Co ntra[tor unless and vn tit it Is app raved by an arFicer in preparation of wprk and material specified under the above improvement spe4fica Lions- All aluminum Storm door, window, <br />and special order produo s ca nnot be ca rcelled, and the fu ll co r)ha cl Arne sha I be paid the cc ntra cto r as N q;r i dated damages for the breaking of the cantract. <br />If all work has been completed and payment is not made, then the contractor will have 1he rights to hire an attorney and :I le a lien it needed. All legal costs involved will he added to the rant ract and a 1-5%in terest per <br />month to any unpaid ❑a la rice. The undersigned Owner hereby acknowledges that he/she has read the cc M1trlct and undevslands that alt materials to be lt. roished and work to be done are shown under the Improvement 5peci ficat ions <br />I isted ahave- It is fun her acknowledged by the undersigned that this Con tra c t con sti rules the entire agree ment betvleen the parties and that no other agfeemens or 5ti pulitions verbal or wrimn. have been made or implied. <br />SOUTH BEND ROOFING & SIDING CO., INC. <br />Mi License #2101207688 <br />Contractor: <br />James Spillman — james@southbendroofing.corn <br /> <br />Proposed To: <br />Owner Signature: <br />Mike White <br />1345 E Wayne St. <br />South Bend, IN,46615 <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.