Terrns and Conditions
<br />Warranty: Rooftech Construction, LLC warranties workmanship for the lif'etime of each individual material under normal
<br />conditions. Ice damming, wind driven rain, pipes installed in attic spaces, and other circumstances beyond our control, are not
<br />covered. Materials installed are not to be altered by any other contractor, company or individual ln the event it has been
<br />altered b5, anyone other than Roo{'tech Construction LLC; the warranty will be l'oided. Shingles and materials are guaranteed
<br />by their manufacturer. Warranties for parts or materials are subject to the manufacturer terms on such products. Extended
<br />manufacturer warranties are ofadditional cost and will be discussed at the time ofpurchase. To make a claim against
<br />Rooftech Construction, T T,C's rvarranty, the customer must provide Root'tech Construction, LLC rvritten notice, by certified
<br />mail, describing the alleged defect. Rooftech Construction, LLC will provide the customer with a written response within 21
<br />days of the day Rooftech Construction, T .T .C receives the customer's initial written notice of an alleged defect. Rooftech
<br />Construction, LLC may offer to remedy the defect, pa)r the claim, or dispute the claim. Rooftech Construction, LLC rvill not
<br />honor a claim unless customer first gives Rooftech Construction, LLC notice in accordance with this section. Unless
<br />explicitly stated, repairs are NOT covered by any extended workm.anship warranty.
<br />Scope of work: Rooftech Construction, Il-C will provide services as described in the attached estimate. All duties will be
<br />performed in accordance with current building codes and regulations. Rooftech Construction, LLC will provide all services,
<br />materials, Iabor, tools, and equipment needed lbr completion of Iisted duties.
<br />Payment Terms: If the customer resides in the address where duties are to be performed a.t, no payment is due upon the
<br />acceptance ofestimate. Ifthe customer does not reside in the address where duties rvill be perfbrrned, 50% ofthe contracted
<br />project's price is due at the time of contract signing. The balance of all contracts are due imrnediately upon project
<br />completion. All checks will be made payable to Rooftech Construction, LLC. In the event of nonpayment of the
<br />balance N,ithin 7 days ofjob completion, the customer must pay to Rooftech Construction, T LC an additional late charge of
<br />10% of the unpaid balance for the first 45 days. An5, rsmririr* unpaid balance after 45 days will be turned over to collections.
<br />AIl. resulting collection and court costs r,r'ill be paid by the customer. The custorner firrther agrees that they rvill be charged a
<br />$50.00 fee for each dishonored bank check. Credit card payments are subject to a $% price increase due to processing
<br />fees.
<br />Cancelation: Ifthe customer chooses to cancel this agreement after signing, a $2,000.00 penalty fine or 10% ofthe
<br />total contract, whichever is greater, is due imrrrediately. In addition., the customer i.s liable for all expenses related to
<br />their project (i.e., materials, permitting, labor, etc.)
<br />Disputes: In the event ofa claim being brought to enforce rights under this contract, Rooftech Construction, LLC shall be
<br />entitled to recover its costs and expenses, i.ncluding but not limited to reasonable attorneys'fees, incurred in the event of, but
<br />not limited to, breach ofthis contract.
<br />Work Change Order: In the even.t of any deviation f'rom the above estirnate involving an alteration in the scope of work,
<br />or any additional costs, Rooftech Construction, t,LC will attempt to notily the customer. Due to specificjob-related variables,
<br />work change orders will be verbal and/or rvritten. Work change orders do not require a signed document to be enforceable. No
<br />jobs can be subcontracted under Rooftech Construction, LLC without rvritten consent of company upper management.
<br />Unforeseen Conditions: Any duties not indicated in the plans or specifications of the above listed contracted duties,
<br />that must be added, repaired, or replaced as a result ofhidden, concealed or changed conditions, or that is required fbr
<br />cornpliance with building reguiations andlor codes, will result in a WOBK CHANGE ORDER. Work change orders will
<br />result in, but are not limited to, additional services, materials, and labor. All of whieh will incur additional costs
<br />that will be paid in full by the OWNER/CUSTOMER, subject to the terms and conditions of this contract.
<br />Conditions: This proposal is valid for 30 da5,s. Rooftech Construction, LLC reserves the right to withdraw this proposal or
<br />re-quote the project ifcontract acceptance is beyond 30 days from the date oforiginal estirnation. All contracts must be signed
<br />before work is commenced. Rooftech Construction, LLC reserves the right to refuse services at an1, tirne prior to
<br />commencement of listed duties.
<br />Accessories: When satellites, antennas, or other unique accessories are present, they will have to he removed to correctly
<br />install new materials. During such events, Rooftech Construction, LLC is not responsible for signal loss and/or the cost re-
<br />instailation ofsuch accessories. Rooftech Construction, LLC is not liable for existing gutter damage that was presentprior to
<br />the cornmencement ofcontracted duties. In situations where gutters need to be removed to complete contracted duties,
<br />Rooftech Construction, T,LC cannot guarartee that gutters rvill be salvageable, but every attempt q.'ill be made to preserve
<br />their origfual condition.
<br />Driveway/Parking Surfaces: During the compietion of contracted duties heav-v equipment such as, but not limited to,
<br />portable cranes, boom trucks, dumpsters, and material delivery vehicles will have to utilize the properties driveway andy'or
<br />parking lots. Preventative measures will be implemented to attempt to protect driveways and/or parking lots. If cracks or
<br />damages do occur, resulting from such equipment, Rooftech Construction, LLC IS NOT LIABLE FOR THE COST
<br />OF REPAIR OR REPI"ACEMENT,
<br />
<br />Customer Initials Date
<br />Page 3 of 3
|