Laserfiche WebLink
<br /> <br /> <br /> Redevelopment Commission Agenda Item <br /> <br />DATE: 09/12/2024 <br />FROM: Patrick Sherman <br />SUBJECT: Gintz Dr and Stephenson Mills Parking Lot <br />Which TIF? (circle one) River West; River East; South Side; Douglas Road; West Washington <br /> <br />PURPOSE OF REQUEST: <br />The request is for $800,000.00 for construction work to re-grade and re-pave Gintz Dr from Colfax to <br />Seitz Park as well as re-build the parking lot for Stephenson Mills. <br />Specifics: <br />Gintz Dr, which is between the Cascades property development and the Stephenson Mill <br />Apartments, is in very poor repair and needs to be re-paved. The grades of the drive are also <br />problematic with how it interacts with the adjacent properties. The City has worked with a <br />design consultant and the two property owners to come to a solution that works for everyone. <br />Completion of this project will adjust the grades of the drive to work better with both sides. It <br />will also close the contractual obligation that the City has to Stephenson Mills to re-pave the <br />parking lot following the ND hydro and Seitz Park projects. <br /> <br />INTERNAL USE ONLY: Project Code: _______________________________________________; <br />Total Amount new/change (inc/dec) in budget: _______________; Break down: <br />Costs: Engineering Amt: ______________________; Other Prof Serv Amt_________________; <br />Acquisition of Land/Bldg (circle one) Amt: ___________; Street Const Amt ________________; <br />Building Imp Amt_________; Sewers Amt_________; Other (specify) Amt: ________________ <br />___________________________________________. Going to BPW for Contracting? Y/N <br />Is this item ready to encumber now? ____ Existing PO#__________ Inc/Dec $_____________ <br />_________________________Pres/V-Pres <br />ATTEST: __________________Secretary <br />Date: ____________________ <br /> APPROVED Not Approved <br />SOUTH BEND REDEVELOPMENT COMMISSION