My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
211 North Michigan Street_AA 2024-0612
sbend
>
Public
>
Historic Preservation
>
2024
>
September
>
Administrative Approvals
>
211 North Michigan Street_AA 2024-0612
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/6/2024 9:42:21 AM
Creation date
9/6/2024 9:41:24 AM
Metadata
Fields
Template:
South Bend HPC
HPC Street Address
211 North Michigan Street
HPC Document Type
Certification
HPC Local Landmark
i. South Bend
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
12
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
100'-0"FIRST LEVEL114'-3"SECOND LEVEL86'-3"LOWER LEVEL145'-0"T/O ROOF130'-9"EQUIPMENT PLATFORM+/- 21'-1" (V.I.F.)9'-8"+/- 4'-10" (V.I.F.)25'-11"+/- 31'-8" (V.I.F.)15'-5"9'-3"8"8'-10"7 1/2"10'-0"8"0041415141313131313121212121111111111E6A-3141. FIELD VERIFY EXISTING CONDITIONS PRIOR TO START OF DEMOLITION WORK. NOTIFY GMI CONSTRUCTION REPRESENTATIVE IN WRITING OF DISCREPANCIES BETWEEN WORK SHOWN IN THE DRAWINGS AND FIELD CONDITIONS ENCOUNTERED.2. OPEN FLAME EQUIPMENT IS NOT PERMITTED FOR REMOVAL OF EXISTING WORK WITHOUT SPECIFIC WRITTEN PERMISSION FROM THE OWNER.3. COORDINATE WITH OWNER ANY ITEMS TO BE SALVAGED. 4. OWNER WILL REMOVE ALL NON-FIXED FURNISHINGS AND EQUIPMENT FROM THE CONSTRUCTION AREA PRIOR TO START OF CONSTRUCTION UNLESS NOTED OTHERWISE.5. MAINTAIN BUILDING IN A WEATHER-TIGHT CONDITION. DO NOT PERFORM WORK ON EXTERIOR OPENINGS THAT CANNOT BE COMPLETED OR MADE WEATHER-TIGHT WHEN INCLEMENT WEATHER IS POSSIBLE.6. REMOVE FLOOR MATERIALS TO THE EXTENT SHOWN OR DESCRIBED IN THE DRAWINGS. REMOVAL INCLUDES ADHESIVES, GROUTING BEDS, ANCHORING DEVICES, ASSOCIATED WALL BASE, ETC. CLEAN AND PREPARE SURFACES FOR INSTALLATION OF NEW FLOOR MATERIALS.7. SEE STRUCTURAL DRAWINGS FOR LINTELS AT NEW PENETRATIONS THROUGH EXISTING WALLS. COORDINATE PENETRATION LOCATIONS WITH ASSOCIATED TRADES.8. COORDINATE WITH OTHER TRADES CUTTING AND PATCHING REQUIRED FOR DEMOLITION OR NEW CONSTRUCTION. DEMOLITION NOTES ANY DEMOLITION OR REMOVAL INDICATED IS SHOWN IN GENERAL TO PROVIDE THE EXTENT OF DEMOLITION AND IS NOT TO BE CONSIDERED AS A RECORD DRAWING OF EXISTING CONDITIONS. THE CONTRACTOR IS RESPONSIBLE FOR IN FIELD VERIFICATION AND COORDINATION WITH THE ARCHITECT PRIOR TO COMMENCING WITH STATED WORK.9. ALL CONSTRUCTION TO REMAIN WHICH IS AFFECTED BY DEMOLITION SHALL BE PATCHED, BE PROPERLY ALIGNED, AND FINISHED SO AS TO LEAVE NO EVIDENCE OF PATCHING OR REPAIR. REPAIR OR REPLACE ANY EXISTING CONSTRUCTION, MATERIALS, OR EQUIPMENT DAMAGED DURING DEMOLITION TO LIKE NEW CONDITION.10. THE CONTRACTOR IS TO RETURN SALVAGEABLE MATERIALS, INCLUDING BUT NOT LIMITED TO DOORS, FRAMES, HARDWARE, MARBLE, EQUIPMENT, AND LIGHTING FIXTURES TO THE OWNER AND STOCKPILE THEM IN AN APPROVED CONSTRUCTION AREA. DISPOSE OF THESE MATERIALS AFTER OWNER'S REVIEW AND APPROVAL.11. CONTRACTOR IS RESPONSIBLE FOR PROTECTION OF ALL FINISHES (TO REMAIN) IN THE PROJECT AREA. COORDINATE WITH OWNER PRIOR TO DEMOLITION.12. CONTRACTOR SHALL ENSURE THAT DUST AND DEBRIS ARE PREVENTED FROM ENTERING THE EXISTING HVAC SYSTEM AND ADJOINING SPACES WITH TEMPORARY BARRIERS AS REQUIRED PER THE BUILDING.13. INDICATION OF NEW MATERIALS SHALL INFER ALL REMOVAL OR DEMOLITION AND PATCHING REQUIRED OF EXISTING MATERIALS AND SUBSTRATES FOR PROPER ALIGNMENT. MATCH EXISTING FINISHES.14. ENLARGED PLANS ARE PROVIDED IN THIS SET; SEE SHEETS DIRECTLY AFTER OVERALL PLANS.15. ONLY ITEMS CALLED OUT IN THIS SHEET SET ARE A PART OF THIS PACKAGE. ITEMS SHOWN ON SHEETS THAT ARE NOT CALLED OUT OR DETAILED ARE NOT TO BE INCLUDED IN SCOPE.16. CONDITIONS UNDERSLAB ARE UNKNOWN. AVAILABLE ORIGINAL BUILDING DRAWINGS WILL BE PROVIDED IN ADDITION TO THESE DRAWINGS, BUT HAVE NOT BEEN CONFIRMED. THEY ARE TO BE USED FOR REFERENCE ONLY. 17. WALL OPENINGS 8" AND LARGER SHALL BE COORDINATED WITH EOR FOR WALL REINFORCEMENT. WALL OPENINGS WITH MULTIPLE PIPES ADJACENT TO ONE ANOTHER WITH LESS THEN 3" BETWEEN NEED TO BE COORDIANTED WITH EOR FOR WALL REINFOCEMENT/CREATING WALL CHASE.18. SLAB AND WALLS ARE REQUIRED TO BE SCANNED FOR EXISTING UTILITIES OR OTHER EMBEDDED ITEMS PRIOR TO DEMOLITION. REFER TO SUBMITTAL SECTION ON GENERAL NOTES SHEET FOR SUBMITTAL REQUIREMENTS A. CONTRACTOR REQUIRED TO PROVIDE SLAB SCANNING FOR POSSIBLE UNDERSLAB ELECTRICAL. COORDINATE METHOD AND TIMING WITH CM TEAM.B. CONTRACTOR REQUIRED UNLESS PER-APPROVED TO PROCEED BY CM TEAM TO SCAN MASONRY WALLS PRIOR TO DEMOLITION.DEMOLITION NOTESAPPROVED BYDRAWN BYISSUED FORISSUE DATEPROJECT NUMBERFIELD BOOK321 S. MAIN STREET. SUITE 103SOUTH BEND, IN 40661574.307.9990 -SHIVE-HATTERY.COM6543BADE1FCG2H654312BADEFCGHAutodesk Revit 2021Board of Public Works, City of South Bend, Indiana1316 County-City Building227 W. Jefferson BoulevardSouth Bend, IN 46001574-235-9251OwnerRATIO101 South Pennsylvania StreetIndianapolis, Indiana 46204317-633-4040Design Architect/ Landscape Architect/ Interior DesignStructural EngineerMechanical / Electrical EngineerCivil EngineerIntroba8250 Haverstick Road, Suite 285Indianapolis, IN 46240800-404-7677DLZ Corporation138 N. Delaware St.Indianapolis, IN 46204317-633-4120Acoustics ConsultantHaverstick Designs160 W. Carmel Dr.Carmel, IN 46032800-272-5067Lighting ConsultantShakespeare Lighting Design 1806 E. Thornton DriveBloomington, IN 47401812-320-2796Troyer GroupLandscape Architect of Record3930 Edison Lakes ParkwayMishawaka, IN 46545574-259-9976Shive-Hattery, Inc. Executive Architect/ Interior Design321 S. Main Street, Suite 103South Bend, IN 46001574-307-9990American Structurepoint, Inc.205 W. Jefferson Boulevard, Suite 404South Bend, IN 46001574-287-22315/9/2024 11:07:56 AMBIM 360://21055-Morris Performing ArtsCenter/SH-MPAC-ARCH-V21.rvtDEMOELEVATIONSBID DOCUMENTS7211780ApproverAuthor05/09/2024A-D04RACLIN MURPHYENCORE CENTERCITY OF SOUTH BEND, INDIANA211 N MICHIGAN STSOUTH BEND, IN 4660101/8" = 1'-0"F6EXISTING EXTERIOR ELEVATION -NORTH12'KEYNOTES - DEMOLITION01REMOVE CURVED STAIR FROM LOWER LEVEL TO FIRSTFLOOR - INLCUDING TREADS & RISERS, RAILINGS ANDSTRUCTURE.02NEW OPENING IN EXISTING MASONRY WALL03REMOVE EXISTING WALL IN ITS ENTIRETY.04REMOVE EXISTING VANITY IN ITS ENTIRETY- CAP OFFSUPPLY AND WASTE LINES- PREP. FOR NEW CONDITIONS05REMOVE EXISTING TOLET IN ITS ENTIRETY- CAP OFFSUPPLY AND WASTE LINES- PREP. FOR NEW CONDITIONS06REMOVE TOILET PARTITION AND STALL DOOR IN ITSENTIRETY08REFER TO STRUCTURAL DRAWING FOR FLOORDEMOLITION09REFER TO STRUCTURAL DRAWINGS FOR SHORING ANDLINTELS AS REQUIRED11DOOR & DOOR FRAME TO BE REMOVED COMPLETE12STAIR SYSTEM TO BE REMOVED. WALL CONNECTION POINTTO BE PATCHED AND REPAIRED AS REQUIRED13STAIR RAIL SYSTEM TO BE REMOVED COMPLETE14PORTION OF EXISTING WALL TO BE REMOVED.COORDINATE WITH STRUCTURAL DRAWINGS15EXISTING WALL TO REMAIN
The URL can be used to link to this page
Your browser does not support the video tag.