Laserfiche WebLink
3 <br />Horner Roofing & Siding, LLC <br />HILL_SARAH_ESTIMATE 8/23/2024 Page: 3 <br />CONTINUED - Garage Roof <br />DESCRIPTION QTY REMOVE REPLACE TOTALTAX <br />21. Additional charge for steep roof -6.00 SQ 0.00 52.50 0.00 315.00 <br />7/12 to 9/12 slope <br />22. Decking - OSB - 5/8"21.00 EA 0.00 75.00 0.00 1,575.00 <br />*Decking is gapped enough that we will want to lay OSB over top of the existing decking. Total re-deck will be around 21 sheets. 21 sheets <br />@ $75/sheet. <br />Totals: Garage Roof 83.35 5,434.50 <br />Debris Removal <br />DESCRIPTION QTY REMOVE REPLACE TAX TOTAL <br />23. Dumpster load - Approx. 30 yards,1.00 EA 656.00 0.00 0.00 656.00 <br />5-7 tons of debris <br />Totals: Debris Removal 0.00 656.00 <br />Line Item Totals: HILL_SARAH_ESTIMATE 324.10 22,055.94