My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
3. 820 Ashland Avenue_COA 2024-0725 PACKET
sbend
>
Public
>
Historic Preservation
>
2024
>
August
>
3. 820 Ashland Avenue_COA 2024-0725 PACKET
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/14/2024 9:53:52 AM
Creation date
8/14/2024 9:42:15 AM
Metadata
Fields
Template:
South Bend HPC
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
42
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Lance & Emma Miller <br />820 Ashland Avenue <br />South Bend, IN 46616 <br /> <br /> <br />dba: RENEWAL BY ANDERSEN OF INDIANA, OHIO & TENNESSEE <br />Legal Name: Windows, LLC | License # (null) <br />1320 City Center Dr. Suite 350 | Carmel, IN 46032 <br />Phone: (317) 428-2054 | Fax: (null) | (null) <br />Measure Tech: Richard Challinor, (574)310-5394 <br />Misc <br />Misc: Misc, Job Charge, Other, Quantity 1, H/O modifi ed-Added Hand lifts to all windows. Home Owner understands and <br />agrees:— That all windows will come with fi berglass screens. — RBA will be installing White aluminum coil to the exterior. — <br />To remove all blinds/drapes and all brackets before install. — To have 3’ of working space around windows before install. — <br />With the operation and handing of all the windows. — That H/O is responsible for any “touch up” painting or staining to <br />interior trim of the door/window. — That there will be glass loss associated with replacement windows. — Headliners, Jamb <br />liners, & Weatherstripping may not be the same interior and or exterior color of the windows. — It could be twelve to sixteen <br />weeks for project completion. Construction: None Material: None <br />UNIT NOTES <br />H/O modified- <br />Added Hand lifts to all windows. <br /> <br />Home Owner understands and agrees: <br />— That all windows will come with fiberglass screens. <br />— RBA will be installing White aluminum coil to the exterior. <br />— To remove all blinds/drapes and all brackets before install. <br />— To have 3’ of working space around windows before install. <br />— With the operation and handing of all the windows. <br />— That H/O is responsible for any “touch up” painting or staining to interior trim of the door/window. <br />— That there will be glass loss associated with replacement windows. <br />— Headliners, Jamb liners, & Weatherstripping may not be the same interior and or exterior color of the <br />windows. <br />— It could be twelve to sixteen weeks for project completion. <br />UNIT CONSTRUCTION <br />UNIT MATERIALS <br />UNIT PHOTOS <br />07/23/24 Page 15 / 23
The URL can be used to link to this page
Your browser does not support the video tag.