My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2. 917 Leland Avenue_COA 2024-0708A PACKET
sbend
>
Public
>
Historic Preservation
>
2024
>
August
>
2. 917 Leland Avenue_COA 2024-0708A PACKET
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/14/2024 9:55:02 AM
Creation date
8/14/2024 9:41:55 AM
Metadata
Fields
Template:
South Bend HPC
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
27
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
5) Changed Conditions: Any work not indicated in the plans or specifications, that must be added, repaired, or <br />replaced as a result of hidden, concealed, or changed conditions, or that is required for compliance with buildings <br />codes or other regulations, shall result in a change order, and shall be paid in full by the Owner/Customer, <br />subject to terms and conditions of this contract. <br />6) Warranty: Company warrants all work will be performed in a good and workmanlike manner. Any warranties <br />for parts or materials are subject to manufacturer terms on such products. Extended warranties are of additional <br />cost and will be discussed at time of purchase. To make a claim on Company’s warranty, Customer must give <br />Company written notice describing the alleged defect. Company will provide Customer a written response within <br />21 days of the day Company receives Customer’s notice. Company may offer to remedy the defect, pay the <br />claim, or dispute the claim. Company will not honor claims unless Customer first gives Company notice in <br />accordance with this section. <br />7) Conditions: This proposal is valid for 4 weeks. Company reserves the right to withdraw this proposal or re- <br />quote the project if contract acceptance is beyond 4 weeks. All contracts must be signed before work is <br />performed and half payment is required 3 days before project start date. <br />8) Accessories: When satellites are present, Reliable Roofing and Construction is not responsible for signal loss <br />due to replacement or repair of roof. We are not liable for gutter damage existing prior to work being completed <br />and when multiple layers and redeck are involved and present. Reliable Roofing and Construction cannot <br />guarantee that gutters will be salvageable. Reliable Roofing and Construction will clean up the job site as well as <br />possible but is not responsible for any damage caused to person, pets, or property as a result of nails or other job <br />site hazards during or after the project. In the case that your project requires the replacement of a roof drain, <br />homeowner is responsible for having a plumber inspect the piping system the drain connects to prior to roof work <br />beginning. This is to ensure the pipes can handle the increased water flow created by a new roof drain. Reliable <br />Roofing and Construction is not liable for any plumbing-related issues or subsequent damage which may arise <br />from the installation of new roof drains. <br />9) Customer: Homeowner to carry fire, tornado, and other necessary insurance. Unless otherwise stated, <br />homeowner consents to photographs/ vidoes of their home/ property being taken and used for marketing <br />purposes. <br />Please make checks payable to Reliable Roofing and Construction. <br />signed on 12-Oct-2023 <br />by Reliable Roofing & Construction <br />Business powered by Markate.com
The URL can be used to link to this page
Your browser does not support the video tag.