My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2. 917 Leland Avenue_COA 2024-0708A PACKET
sbend
>
Public
>
Historic Preservation
>
2024
>
August
>
2. 917 Leland Avenue_COA 2024-0708A PACKET
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/14/2024 9:55:02 AM
Creation date
8/14/2024 9:41:55 AM
Metadata
Fields
Template:
South Bend HPC
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
27
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
FROM: <br />Reliable Roofing & Construction <br />License: 5148-23 <br />2048 East Ireland Road, Suite A <br />South Bend, IN, 46614 <br />Email: dani@reliableroofingonline.com <br />Phone: (574) 302-7977 <br />ESTIMATE <br /># EST-003867 <br />Estimate Date: Oct 12, 2023 <br />Expiry Date:Nov 09, 2023 <br />TO: <br />Jennifer Stone <br />917 Leland Avenue <br />South Bend, IN, 46616 <br />Phone: ( <br />JOB LOCATION: <br />Jennifer Stone <br />917 Leland Avenue <br />South Bend, IN, 46616 <br />Phone: ( <br />JOB: <br />#Services Qty Price Total <br />1 Repair(l) - Framing 1.00 $24,650.00 $24,650.00 <br />This line item is for demolition and installation of new framing of the 2nd story section of the roof of the <br />house. Slopes (Q, M, L, and possibly K) in pic. Raising the pitch 2 inches from existing pitch to give more <br />head room on the 3rd story. Framing in a new dormer for a 3rd story bathroom, sheeting the roof that was <br />demod and the higher walls and drying in with wrap where needed. Along with building the 4 walls for the <br />new bathroom on the 3rd story. <br />Approx Scope; <br />• Framing of Roof <br />• Building Dormer <br />• Building Walls for the 3rd Story Bathroom <br />• Installing stairs to get to the 3rd story <br />• Drying in new framing <br />* This estimate does not include any finishing work. <br />#Products Qty Price Total <br />2 Dumpster (20yd)1.00 $500.00 $500.00
The URL can be used to link to this page
Your browser does not support the video tag.