Laserfiche WebLink
CITY ENGINEER'S REPORT <br />Section 3 Phase 1 <br />June 10, 2024 <br />This Major Secondary Subdivision, Willowgate Trails, Section Three Phase 1, will require the following improvementE <br />ITEM # <br />DESCRIPTION <br />QUANTITY <br />UNIT <br />PRICE <br />TOTAL <br />1 <br />8" Sanitary Sewer <br />1438 <br />LIN.FT. <br />$40.00 <br />$57,520 <br />2 <br />Sanitary Manholes <br />7 <br />EACH <br />$4,500.00 <br />$31,500 <br />3 <br />Sanitary Laterals <br />37 <br />EACH <br />$1,200.00 <br />$44,400 <br />4 <br />Connection to Exisiting <br />1 <br />EACH <br />$1,000.00 <br />$1,000 <br />5 <br />Fire Hydrant <br />7 <br />EACH <br />$5,000.00 <br />$35,000 <br />6 <br />8" Water Main <br />1920 <br />UNIT. <br />$85.00 <br />$163,200 <br />7 <br />Water Services <br />37 <br />EACH <br />$1,800.00 <br />$66,600 <br />8 <br />8" Water Valve <br />8 <br />EACH <br />$2,500.00 <br />$20,000 <br />TOTAL $419,220.00 <br />The required improvements have been satisfactorily completed, a three year maintenance bond <br />has been received. <br />X The required improvements have not been completed, but a Letter of Credit has been filed in the <br />following amount for the required improvements. <br />ITEM # DESCRIPTION QUANTITY UNIT PRICE TOTAL <br />As Above As Above As Above As Above As Above $419,220.00 <br />Comments: Section 3 Phase 1 includes 37 Lots <br />City Engineer Date <br />