My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Sewer & Water Service Agreement - Willowgate Trails – Green Development Ventures, LLC
sbend
>
Public
>
Public Works
>
Board of Works Documents
>
2024
>
Agreements/Contracts/Proposals/Addenda
>
Sewer & Water Service Agreement - Willowgate Trails – Green Development Ventures, LLC
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/13/2024 2:12:11 PM
Creation date
8/13/2024 2:11:11 PM
Metadata
Fields
Template:
Board of Public Works
Document Type
Contracts
Document Date
8/13/2024
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
39
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
The Owner shall consult the City and allow the City Engineer or her designee input prior <br />to designating the project engineer who shall be responsible for the engineering design and <br />inspection in connection with the installation of the Dedicated Improvements (the "Project <br />Engineer"). The Owner shall inspect the site during construction to ensure the Project Engineer’s <br />conformance to zoning requirements, adequacy of design, and conformance to the City's <br />specifications and standards regarding location, size and depth of line, and quality of construction <br />of the Dedicated Improvements. The Owner shall provide the plans with a City of South Bend <br />cover sheet and specifications for the Dedicated Improvements along with a cost estimate to the <br />City. The Owner shall also provide to the City a statement from the Project Engineer certifying <br />that the materials and workmanship including pipes, bedding, manholes, and other related <br />materials and work meet the City’s specifications and standards. Upon request of the City, the <br />certification shall be substantiated by material affidavits from suppliers and by applicable test <br />results for inflow/infiltration, exfiltration, deflection, pressure, leaks, bacteria, compaction and <br />other tests required by the City. All construction, engineering, and inspection costs in connection <br />with the Dedicated Improvements shall be borne by the Owner. <br />3. Construction Inspection <br />The Owner has provided the City with Exhibit A, which depicts drawings of the Dedicated <br />Improvements, which the City acknowledges conforms to the City’s standards. The Owner shall <br />allow the City to inspect the Dedicated Improvements during construction to ensure conformance <br />to the agreed standards set forth in Exhibit A, in particular regarding zoning requirements, <br />adequacy of design, and quality of construction. The Owner shall contact the City’s Engineering <br />Department at least two (2) business days in advance to arrange for the attendance of a City <br />inspector at key milestones throughout work. Key milestones shall include but not limited to:
The URL can be used to link to this page
Your browser does not support the video tag.