My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PSA - Traffic Signal at Portage Ave. and Cleveland Rd. – Jones Petrie Rafinski Corp.
sbend
>
Public
>
Public Works
>
Board of Works Documents
>
2024
>
Agreements/Contracts/Proposals/Addenda
>
PSA - Traffic Signal at Portage Ave. and Cleveland Rd. – Jones Petrie Rafinski Corp.
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/16/2025 4:12:48 PM
Creation date
8/13/2024 2:06:05 PM
Metadata
Fields
Template:
Board of Public Works
Document Type
Contracts
Document Date
8/13/2024
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
30
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
G. At any time, Owner may request that Engineer or its Consultants, at Owner's sole expense, <br />provide additional insurance coverage, increased limits, or revised deductibles that are more <br />protective than those specified in Exhibit G. If so requested by Owner, and if commercially <br />available, Engineer shall obtain and shall require its Consultants to obtain such additional <br />insurance coverage, different limits, or revised deductibles for such periods of time as <br />requested by Owner, and Exhibit G will be supplemented to incorporate these requirements. <br />6.05 Suspension and Termination <br />A. Suspension: <br />1. By Owner: Owner may suspend the Project for up to 90 days upon seven days written <br />notice to Engineer. <br />2. By Engineer: Engineer may, after giving seven days written notice to Owner, suspend <br />services under this Agreement if Engineer's performance has been substantially delayed <br />through no fault of Engineer. <br />B. Termination: The obligation to provide further services under this Agreement may be <br />terminated: <br />For cause, <br />a. By either party upon 30 days written notice in the event of substantial <br />failure by the other party to perform in accordance with the terms hereof <br />through no fault of the terminating party. <br />b. By Engineer: <br />1) upon seven days written notice if Owner demands that Engineer <br />furnish or perform services contrary to Engineer's responsibilities as <br />a licensed professional; or <br />2) upon seven days written notice if the Engineer's services for the <br />Project are delayed or suspended for more than 90 days for reasons <br />beyond Engineer's control. <br />3) Engineer shall have no liability to Owner on account of such <br />termination. <br />C. Notwithstanding the foregoing, this Agreement will not terminate under <br />Paragraph 6.05.13. La if the party receiving such notice begins, within seven <br />days of receipt of such notice, to correct its substantial failure to perform <br />and proceeds diligently to cure such failure within no more than 30 days of <br />receipt thereof, provided, however, that if and to the extent such substantial <br />failure cannot be reasonably cured within such 30 day period, and if such <br />party has diligently attempted to cure the same and thereafter continues <br />diligently to cure the same, then the cure period provided for herein shall <br />extend up to, but in no case more than, 60 days after the date of receipt of <br />the notice. <br />Page 8 <br />EJCDC E-500 Agreement Between Owner and Engineer for Professional Services <br />Copyright © 2008 National Society of Professional Engineers for EJCDC. All ri hts reserved. <br />
The URL can be used to link to this page
Your browser does not support the video tag.