My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PSA - Traffic Signal at Portage Ave. and Cleveland Rd. – Jones Petrie Rafinski Corp.
sbend
>
Public
>
Public Works
>
Board of Works Documents
>
2024
>
Agreements/Contracts/Proposals/Addenda
>
PSA - Traffic Signal at Portage Ave. and Cleveland Rd. – Jones Petrie Rafinski Corp.
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/16/2025 4:12:48 PM
Creation date
8/13/2024 2:06:05 PM
Metadata
Fields
Template:
Board of Public Works
Document Type
Contracts
Document Date
8/13/2024
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
30
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
2. Engineer may, after giving seven days written notice to Owner, suspend services under <br />this Agreement until Owner has paid in full all non -disputed amounts due for services, <br />expenses, and other related charges. Owner waives any and all claims against Engineer <br />for any such suspension. <br />C. C. Disputed Invoices: If Owner contests an invoice, Owner shall promptly advise <br />Engineer of the specific basis for doing so, may withhold only that portion so contested, and <br />must pay the undisputed portion. <br />D. D. Legislative Actions: If after the Effective Date any governmental entity takes a <br />legislative action that imposes taxes, fees, or charges on Engineer's services or <br />compensation under this Agreement, then the Engineer may invoice such new taxes, fees, or <br />charges as a Reimbursable Expense to which a factor of 1.0 shall be applied. Owner shall <br />reimburse Engineer for the cost of such invoiced new taxes, fees, and charges; such <br />reimbursement shall be in addition to the compensation to which Engineer is entitled under <br />the terms of Exhibit C. <br />ARTICLE 5 — OPINIONS OF COST <br />5.01 Opinions of Probable Construction Cost <br />A. A. Engineer's opinions of probable Construction Cost are to be made on the basis of <br />Engineer's experience and qualifications and represent Engineer's best judgment as an <br />experienced and qualified professional generally familiar with the construction industry. <br />However, because Engineer has no control over the cost of labor, materials, equipment, or <br />services furnished by others, or over contractors' methods of determining prices, or over <br />competitive bidding or market conditions, Engineer cannot and does not guarantee that <br />proposals, bids, or actual Construction Cost will not vary from opinions of probable <br />Construction Cost prepared by Engineer. If Owner requires greater assurance as to probable <br />Construction Cost, Owner must employ an independent cost estimator as provided in <br />Exhibit B. <br />5.02 Designing to Construction Cost Limit <br />A. No Construction Cost limit is established between Owner and Engineer for this agreement. <br />5.03 Opinions of Total Project Costs <br />A. The services, if any, of Engineer with respect to Total Project Costs shall be limited to <br />assisting the Owner in collating the various cost categories which comprise Total Project <br />Costs. Engineer assumes no responsibility for the accuracy of any opinions of Total Project <br />Costs. <br />Page 3 <br />EJCDC E-500 Agreement Between Owner and Engineer for Professional Services <br />Copyright © 2008 National Society of Professional Engineers for EJCDC. M rights reserved. <br />
The URL can be used to link to this page
Your browser does not support the video tag.