My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PSA - Traffic Signal at Portage Ave. and Cleveland Rd. – Jones Petrie Rafinski Corp.
sbend
>
Public
>
Public Works
>
Board of Works Documents
>
2024
>
Agreements/Contracts/Proposals/Addenda
>
PSA - Traffic Signal at Portage Ave. and Cleveland Rd. – Jones Petrie Rafinski Corp.
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/16/2025 4:12:48 PM
Creation date
8/13/2024 2:06:05 PM
Metadata
Fields
Template:
Board of Public Works
Document Type
Contracts
Document Date
8/13/2024
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
30
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
1. Nothing in this Agreement shall be construed to create, impose, or give rise to any duty <br />owed by Owner or Engineer to any Contractor, Subcontractor, Supplier, other individual <br />or entity, or to any surety for or employee of any of them. <br />2. All duties and responsibilities undertaken pursuant to this Agreement will be for the sole <br />and exclusive benefit of Owner and Engineer and not for the benefit of any other party. <br />3. Owner agrees that the substance of the provisions of this Paragraph 6.07.0 shall appear in <br />the Contract Documents. <br />6.08 Dispute Resolution <br />B. then <br />s <br />either- or- both may invoke the pmeeduFes of Exhibit 14, If Exhibit H is not included, or if no <br />dispute resolution method is specified in Exhibit H, then the parties may exercise their rights <br />under law. <br />6.09 Environmental Condition of Site <br />A. Owner has disclosed to Engineer in writing the existence of all known and suspected <br />Asbestos, PCBs, Petroleum, Hazardous Waste, Radioactive Material, hazardous substances, <br />and other Constituents of Concern located at or near the Site, including type, quantity, and <br />location. <br />B. Owner represents to Engineer that to the best of its knowledge no Constituents of Concern, <br />other than those disclosed in writing to Engineer, exist at the Site. <br />C. If Engineer encounters or learns of an undisclosed Constituent of Concern at the Site, then <br />Engineer shall notify (1) Owner and (2) appropriate governmental officials if Engineer <br />reasonably concludes that doing so is required by applicable Laws or Regulations. <br />D. It is acknowledged by both parties that Engineer's scope of services does not include any <br />services related to Constituents of Concern. If Engineer or any other party encounters an <br />undisclosed Constituent of Concern, or if investigative or remedial action, or other <br />professional services, are necessary with respect to disclosed or undisclosed Constituents of <br />Concern, then Engineer may, at its option and without liability for consequential or any <br />other damages, suspend performance of services on the portion of the Project affected <br />thereby until Owner: (1) retains appropriate specialist consultants or contractors to identify <br />and, as appropriate, abate, remediate, or remove the Constituents of Concern; and <br />(2) warrants that the Site is in full compliance with applicable Laws and Regulations. <br />E. If the presence at the Site of undisclosed Constituents of Concern adversely affects the <br />performance of Engineer's services under this Agreement, then the Engineer shall have the <br />option of (1) accepting an equitable adjustment in its compensation or in the time of <br />completion, or both; or (2) terminating this Agreement for cause on 30 days notice. <br />Page 10 <br />EJCDC E-500 Agreement Between Owner and Engineer for Professional Services <br />Copyright 0 2008 National Society of Professional Engineers for EJCDC. All rights reserved. <br />
The URL can be used to link to this page
Your browser does not support the video tag.