My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PSA - Potawatomi Park Improvements, Phase I Proj No. 124-023 – Abonmarche Consultants, Inc.
sbend
>
Public
>
Public Works
>
Board of Works Documents
>
2024
>
Agreements/Contracts/Proposals/Addenda
>
PSA - Potawatomi Park Improvements, Phase I Proj No. 124-023 – Abonmarche Consultants, Inc.
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/13/2024 2:06:04 PM
Creation date
8/13/2024 2:05:47 PM
Metadata
Fields
Template:
Board of Public Works
Document Type
Contracts
Document Date
8/13/2024
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
67
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Page 1 Exhibit C – Compensation Packet RPR-5: Resident Project Representative ServicesSalary Costs Times a Factor Method of Payment EJCDC E-500 Agreement Between Owner and Engineer for Professional Services. Copyright © 2008 National Society of Professional Engineers for EJCDC. All rights reserved. Article 2 of the Agreement is supplemented to include the following agreement of the parties: ARTICLE 2 – OWNER’S RESPONSIBILITIES C2.01 Compensation for Basic Services (other than Resident Project Representative) – Lump Sum Method of Payment A. Owner shall pay Engineer for Basic Services set forth in Exhibit A, except for services of Engineer’s Resident Project Representative, if any, as follows: 1. A Lump Sum amount of $270,300 based on the following estimated distribution of compensation: a. Topographic Survey $ 30,200 b. Route Survey, Plats and Descriptions (2 @ $2,300 each), title work $ 9,700 c. Geotechnical Investigation $ 12,000 d. Asbestos Investigation $ 2,800 e. Pool Demolition – Preliminary Design Plans $ 20,200 f. Greenlawn and Wall - Preliminary Design Plans $ 90,500 g. Pool Demolition – Final Design Plans $ 13,200 h. Greenlawn and Wall – Final Design Plans $ 59,900 i. Utility Coordination $ 13,500 j. Bidding and Negotiating Phase $ 8,300 k. Construction Phase $ 10,000 2. Engineer may alter the distribution of compensation between individual phases noted herein to be consistent with services actually rendered, but shall not exceed the total Lump Sum amount unless approved in writing by the Owner. 3. The Lump Sum includes compensation for Engineer’s services and services of Engineer’s Consultants, if any. Appropriate amounts have been incorporated in the Lump Sum to account for labor, overhead, profit, and Reimbursable Expenses. 4. The portion of the Lump Sum amount billed for Engineer’s services will be based upon Engineer’s estimate of the percentage of the total services actually completed during the billing period.
The URL can be used to link to this page
Your browser does not support the video tag.