Laserfiche WebLink
DRAFTCreated By:DNP Checked by:LSG <br />Date:1/16/2024 Date Checked:2/7/2024 <br />Updated By:LAG <br />Date Updated:2/7/2024 <br />QUANTITY UNIT UNIT COST ITEM COST <br />1 Excavation, Common 300 CYS $63.00 $18,900.00 <br />2 Concrete, Remove 85 SYS $62.00 $5,270.00 <br />3 HMA Surface, PG70-22P, Type B 130 TON $115.00 $14,950.00 <br />4 HMA Patching, Full Depth, Type B 65 TON $347.00 $22,555.00 <br />5 Milling, Asphalt, 2 IN.1150 SYS $11.00 $12,650.00 <br />6 Asphalt for Tack Coat 1 TON $682.00 $682.00 <br />7 Joint Adhesive, Surface 810 LFT $0.50 $405.00 <br />8 Liquid Asphalt Sealant 810 LFT $0.50 $405.00 <br />9 Compacted Aggregate, No. 53 60 TON $36.00 $2,160.00 <br />10 Subgrade Treatment, Type II 250 SYS $86.00 $21,500.00 <br />11 PCCP for Approaches, 6 IN.40 SYS $134.00 $5,360.00 <br />12 Sidewalk, Concrete 200 SYS $58.00 $11,600.00 <br />13 Curbwalk, Concrete 30 SYS $135.00 $4,050.00 <br />14 Curb, Concrete 355 LFT $66.00 $23,430.00 <br />15 Curb Ramp, Concrete 45 SYS $273.00 $12,285.00 <br />16 Detectable Warning Surfaces 10 SYS $432.00 $4,320.00 <br />17 Line, Thermoplastic, Solid, Yellow, 4 IN.570 LFT $5.00 $2,850.00 <br />18 Line, Thermoplastic, Solid, White, 4 IN.50 LFT $2.50 $125.00 <br />19 Transverse Marking, Thermoplastic, Stop Line, White, 24 IN.70 LFT $20.00 $1,400.00 <br />20 Transverse Marking, Thermoplastic, Crosswalk Line, White, 6 IN.270 LFT $5.00 $1,350.00 <br />21 Transverse Marking, Thermoplastic, Crosswalk Line, White, 24 IN.195 LFT $20.00 $3,900.00 <br />22 Pavement Message Marking, Thermoplastic, Lane Indication Arrow 2 EA $250.00 $500.00 <br />23 Site Restoration 1 LS $25,000.00 $25,000.00 <br />24 Traffic Signal Improvements 1 LS $150,000.00 $150,000.00 <br />25 Street Lighting 1 LS $150,000.00 $150,000.00 <br />26 Construction Engineering (5%)1 LS $24,782.35 $24,783.00 <br />27 Mobilization and Demobilization (5%)1 LS $24,782.35 $24,783.00 <br />28 Clearing Right of Way (2%)1 LS $9,921.00 $9,921.00 <br />29 Maintenance of Traffic (5%)1 LS $24,782.35 $24,783.00 <br />30 Erosion Control (2%)1 LS $9,912.94 $9,913.00 <br />Contingency (20%)1 LS $99,129.40 $99,130.00 <br />Total Cost Estimate $688,960.00 <br />DESCRIPTIONItem No.Miami and Lincolnway <br />PRELIMINARY CONSTRUCTION COST ESTIMATE