My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PSA - LW E. & Miami Intersection Imprvmnts. Proj No. 123-078 – A&Z Engineering, LLC - TABLED
sbend
>
Public
>
Public Works
>
Board of Works Documents
>
2024
>
Agreements/Contracts/Proposals/Addenda
>
PSA - LW E. & Miami Intersection Imprvmnts. Proj No. 123-078 – A&Z Engineering, LLC - TABLED
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/13/2024 2:05:47 PM
Creation date
8/13/2024 2:05:32 PM
Metadata
Fields
Template:
Board of Public Works
Document Type
Contracts
Document Date
8/13/2024
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
51
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
DRAFTClient:City of South Bend <br />Project Name:Miami Road & Lincoln Way East Intersection Improvements <br />South Bend Project No.:123-078 <br />Manhour Justification Principle Sr. PMSr PEngrSr Designer/ Sr SurveyorEngineer/DesignerTechnician Admin2 Person Survey Crew1 Person Survey Crew Total Hrs Total FeeTask Description <br />Task 4 100% Final Design Plans / Submission 0 8 0 0 28 0 0 0 0 36 4,600$ <br />69 Title Sheet / 1 Sht 1 120$ <br />70 Finalize Index Sheet with Pertinent Utility Information / 1 Sht 1 120$ <br />71 Typical Cross Sections / 1 Sht 1 120$ <br />72 Demolition Plans (1"= 20') / 2 Sht 1 120$ <br />73 Maintenance of Traffic - 3 Phases max (1" = 50') / 4 Shts 2 240$ <br />74 Plan and Profile (1" = 20') / 3 Shts 2 240$ <br />75 Signal Plan / 1 Sht 2 240$ <br />76 Lighting Plan and Details/ 2 Shts 2 240$ <br />77 Erosion Control Plans (1"= 40') / 1Plan+ 1detail Sht 2 240$ <br />78 Pavement, Sign and Marking Summary Sheet/ 1 Sht 2 240$ <br />79 Ramp Design and details / 1 Sht 2 240$ <br />80 Cross-Section Sheets/ 12 Shts 2 240$ <br />81 Qty Calcs and Cost Estimate 2 240$ <br />82 Specifications 2 310$ <br />83 QA/QC time 4 2 860$ <br />84 Utility Coordination 2 240$ <br />85 CSGP Permit Application 2 310$ <br />86 City Tracing Submital 2 240$ <br />4 of 5
The URL can be used to link to this page
Your browser does not support the video tag.