My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Authorization Early Release Work - Splashpad, Kid Zone, Decking – Larson Danielson Construction
sbend
>
Public
>
Public Works
>
Board of Works Documents
>
2024
>
Agreements/Contracts/Proposals/Addenda
>
Authorization Early Release Work - Splashpad, Kid Zone, Decking – Larson Danielson Construction
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/16/2025 3:28:20 PM
Creation date
8/13/2024 2:05:04 PM
Metadata
Fields
Template:
Board of Public Works
Document Type
Contracts
Document Date
8/13/2024
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
37
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
§ 6 Insurance and Bonds Required for the Early Release Work: <br />§ 6.1 The Owner and Construction Manager shall purchase and maintain insurance for the Early Release Work as set <br />forth in the Agreement, unless otherwise indicated below: <br />(Identify any insurance requirements that differ from those stated in the Agreement, such as coverages types, coverage <br />limits, durations for professional liability or other coverages, and other terms and conditions) <br />The Owner shall provide the required property insurance noted in section 13.2.3 of Agreement Exhibit B. <br />§ 6.2 Other Insurance: <br />In addition to the insurance requirements in the Agreement, the Construction Manager and/or Owner shall carry the <br />following types of insurance: <br />(List below any other insurance coverage to be purchased and maintained by the Construction Manager or Owner for <br />the Early Release Work, not otherwise required by the Agreement, such as pollution insurance, etc) <br />None. <br />§ 6.3 The Construction Manager shall provide bonds for the Early Release Work, in accordance with the requirements <br />of the Agreement, unless otherwise indicated below: <br />(Identify any bond requirements that differfrom those stated in the Agreement, such as any difference in the penal sum <br />of the bonds) <br />No change. <br />§ 7 Other Terms and Conditions for the Early Release Work: <br />All terms and conditions of the Agreement shall apply to the Early Release Work unless otherwise indicated below. <br />(Describe any terms and conditions related to the Early Release Work that differ from the terms and conditions of the <br />Agreement.) <br />The allowances and contingencies included in the Early Release 2: Exhibit 7 List of Allowances and Contingencies. <br />This Authorization is entered into as of the day and year first above written. <br />CITY OF SOUTH BEND, INDIANA <br />BOARD OF PUBLIC WORKS <br />Elizabeth A. Maradik, President <br />Gary A. Gilot, Member <br />Murray L. Miller, Member <br />LARSON-DANIELSON CONSTRUCTION <br />COMPANY, INC <br />(Row deleted) <br />Brian T. Larson, P.E., President <br />Joseph R. Molnar, Vice President <br />Briana Micou, Member <br />Y��V_ <br />Attest: Theresa M. Heffner, Clerk <br />Date: August 13, 2024 <br />Init. AIA Document G735 — 2021. Copyright 02021. All rights reserved. "The American Institute of Architects," "American Institute of Architects," "AIA," the AIA Logo, <br />and "AIA Contract Documents" are trademarks of The American Institute of Architects. This document was produced at 08:42:10 ET on 08/08/2024 under Order 3 <br />No.2114549984 which expires on 07/14/2025, is not for resale, is licensed for one-time use only, and may only be used in accordance with the AIA Contract <br />t Documents® Terms of Service. To report copyright violations, e-mail docinfo@aiacontracts.com. <br />User Notes: (2050181713) <br />
The URL can be used to link to this page
Your browser does not support the video tag.