My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Authorization Early Release Work - Splashpad, Kid Zone, Decking – Larson Danielson Construction
sbend
>
Public
>
Public Works
>
Board of Works Documents
>
2024
>
Agreements/Contracts/Proposals/Addenda
>
Authorization Early Release Work - Splashpad, Kid Zone, Decking – Larson Danielson Construction
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/16/2025 3:28:20 PM
Creation date
8/13/2024 2:05:04 PM
Metadata
Fields
Template:
Board of Public Works
Document Type
Contracts
Document Date
8/13/2024
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
37
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
IMILARSON City of South Bend ELSON FOUR WINDS FIELD EXPANSION & RENOVATION <br />DANI <br />ConsduchonCompany, Inc. EARLY RELEASE 2: EXHIBIT 7 <br />List of Allowances and Contingencies <br />Allowances <br />The following allowances are included in the Early Release Work. These allowances serve two <br />purposes. First, these allowances provide funding sources for work in bid packages that are <br />being rebid. Second, these allowances fund potential work that may be needed to complete the <br />project, but which is either not defined in the project documents or not defined in sufficient <br />detail in the project documents to accurately estimate the value. The Early Release Work shall <br />be adjusted, either with additions or deductions, by Change Order, by the difference between <br />the actual cost of the work allocated to these allowances and the allowance value noted below. <br />Upon mutual agreement between the Construction Manager and Owner, these allowances may <br />be used for purposes other than the proposed uses noted below. <br />Amount Title Proposed Allowance Use <br />$30,000 Playground Install the playground equipment shown on sheet 2-C201 <br />Installation as noted in keynotes 1-6 on the "Play Structure Legend" <br />on that sheet. Nu -Toys, the lowest and only bidder for Bid <br />Package 4 — Play Equipment & Surface could not find a <br />suitable installer for this part of the Bid Package 4 scope. <br />Construction Manager Contingency <br />The following Construction Manager contingency is included in this Early Release Work. This <br />contingency is for the Construction Manager's exclusive use to cover those costs considered <br />reimbursable as the Cost of the Work but not included in a Change Order. The value of this <br />contingency shall not be increased, except in proportion to the amount of approved Change <br />Orders increasing the Early Release Work. <br />Amount Title <br />$40,695 CMc Post -Bid Contingency (1% of this total Early Release Work) <br />Design/Owner Contingency <br />The following Design/Owner contingency is included in this Early Release Work. This <br />contingency is for the Owner's exclusive use to cover costs for work not included in the <br />specifications (Exhibit 3), drawings (Exhibit 4), and allowances listed above, subject to the <br />assumptions and clarifications in Exhibit 2. These costs include, but are not limited to, changes <br />to the scope of the project, design changes necessary to accomplish the originally intended <br />Early Release 2: Exhibit 7 Page 26/27 <br />
The URL can be used to link to this page
Your browser does not support the video tag.