My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Amendment No. 1 to OEA - Kennedy Park Improvements Project No. 123-008 – DLZ Indiana, LLC
sbend
>
Public
>
Public Works
>
Board of Works Documents
>
2024
>
Agreements/Contracts/Proposals/Addenda
>
Amendment No. 1 to OEA - Kennedy Park Improvements Project No. 123-008 – DLZ Indiana, LLC
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/13/2024 2:05:03 PM
Creation date
8/13/2024 2:04:56 PM
Metadata
Fields
Template:
Board of Public Works
Document Type
Contracts
Document Date
8/13/2024
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
23
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br /> <br />Page 3 <br />(Exhibit K – (Amendment to Owner-Engineer Agreement) – Attachment 1) <br />EJCDC E-500 Agreement Between Owner and Engineer for Professional Services. <br />Copyright © 2008 National Society of Professional Engineers for EJCDC. All rights reserved. <br /> <br />i. Architectural/Structural Plans <br />ii. Electrical Plans <br />iii. Mechanical and Plumbing Plans <br />iv. Details <br />c) Restroom Building Renovation Drawings <br />i. Architectural/Structural Plans <br />ii. Electrical Plans <br />iii. Mechanical and Plumbing Plans <br />iv. Details <br />d) Advise Owner if additional reports, data, information, or services of the types <br />described in Exhibit B are necessary and assist Owner in obtaining such reports, <br />data, information, or services. <br />e) Deliverable - Furnish (1) electronic review copy of the 60% Design Phase <br />documents to Owner. Submittal will include the following deliverables. <br />i. 60% Design Plans <br />ii. Outline Specifications <br />iii. Opinion of Probable Costs <br />f) Engineer’s services under the 60% Design Phase will be considered complete <br />on the date when the 60% Design Plans, Preliminary Specifications, and <br />Opinion of Probable Construction Cost have been delivered to Owner. <br />6) 90% Design Phase: After acceptance by Owner of the 60% Design Plans, <br />Preliminary Specifications, and Opinion of Probable Construction Cost as <br />determined in the 60% Design Phase, and any other deliverables subject to any <br />Owner-directed modifications or changes in the scope, extent, character, or design <br />requirements of or for the Project, and upon written authorization from Owner, <br />Engineer shall: <br />a) Further develop the Plan Drawings listed in the 60% Design Phase to a 90% <br />level of completion. <br />b) Advise Owner if additional reports, data, information, or services of the types <br />described in Exhibit B are necessary and assist Owner in obtaining such reports, <br />data, information, or services. <br />c) Deliverable - Furnish (1) electronic review copy of the 90% Design Phase <br />documents to Owner. Submittal will include the following deliverables. <br />i. 90% Design Plans <br />ii. Preliminary Specifications <br />iii. Opinion of Probable Costs <br />d) Engineer’s services under the 90% Design Phase will be considered complete <br />on the date when the 90% Design Plans, Preliminary Specifications, and <br />Opinion of Probable Construction Cost have been delivered to Owner. <br />7) Final Design Phase: After acceptance by Owner of the 90% Design Plans, <br />Preliminary Specifications, and Opinion of Probable Construction Cost as <br />determined in the 90% Design Phase, and any other deliverables subject to any <br />Owner-directed modifications or changes in the scope, extent, character, or design <br />requirements of or for the Project, and upon written authorization from Owner, <br />Engineer shall:
The URL can be used to link to this page
Your browser does not support the video tag.