Laserfiche WebLink
This contract does not include demolition of the smokestack. <br />Seven bids were received, with a breakdown of the bids as follows: <br />Contractor <br />Base Bid <br />Alternate 1 <br />Alternate 2 <br />BB+A1+A2 <br />Wooldridge Construction <br />$559,335 <br />$84,000 <br />N/A* <br />$643,335 <br />Green Demolition <br />$948,800 <br />$82,800 <br />($68,000) <br />$963,600 <br />Renascent Inc. <br />$1,350,000 <br />$113,500 <br />($76,500) <br />$1,387,000 <br />C&E Excavating <br />$1,436,452 <br />$11,108 <br />($130,000) <br />$1,317,560 <br />MRD Group <br />$1,590,500 <br />$80,000 <br />($140,000) <br />$1,530,500 <br />Indiana Earth <br />$1,644,130 <br />$23,000 <br />($364,000) <br />$1,303,130 <br />Adamo Demolition <br />$2,027,500 <br />$53,500 <br />($200,000) <br />$1,881,000 <br />*The bid from Wooldridge Construction did not acknowledge Addendum 1, which issued a <br />revised Bid/Proposal form. Furthermore, Wooldridge Construction did not meet either M/WBE <br />goal for the project, stating they would self -perform all work. <br />The second low bid from Green Demolition is complete and responsive. Green Demolition <br />acknowledged Addendum 1, met both the M/WBE goals, and are prequalified as a Reponsible <br />Bidder for the City of South Bend. <br />I recommend award of the Base Bid, Alternate 1 and Alternate 2 for Drewry's Brewery <br />Cleanup, Phase II to Green Demolition, in the amount of $963,600. Funding is available <br />through PR-00034202. <br />Page 2of2 <br />