This contract does not include demolition of the smokestack.
<br />Seven bids were received, with a breakdown of the bids as follows:
<br />Contractor
<br />Base Bid
<br />Alternate 1
<br />Alternate 2
<br />BB+A1+A2
<br />Wooldridge Construction
<br />$559,335
<br />$84,000
<br />N/A*
<br />$643,335
<br />Green Demolition
<br />$948,800
<br />$82,800
<br />($68,000)
<br />$963,600
<br />Renascent Inc.
<br />$1,350,000
<br />$113,500
<br />($76,500)
<br />$1,387,000
<br />C&E Excavating
<br />$1,436,452
<br />$11,108
<br />($130,000)
<br />$1,317,560
<br />MRD Group
<br />$1,590,500
<br />$80,000
<br />($140,000)
<br />$1,530,500
<br />Indiana Earth
<br />$1,644,130
<br />$23,000
<br />($364,000)
<br />$1,303,130
<br />Adamo Demolition
<br />$2,027,500
<br />$53,500
<br />($200,000)
<br />$1,881,000
<br />*The bid from Wooldridge Construction did not acknowledge Addendum 1, which issued a
<br />revised Bid/Proposal form. Furthermore, Wooldridge Construction did not meet either M/WBE
<br />goal for the project, stating they would self -perform all work.
<br />The second low bid from Green Demolition is complete and responsive. Green Demolition
<br />acknowledged Addendum 1, met both the M/WBE goals, and are prequalified as a Reponsible
<br />Bidder for the City of South Bend.
<br />I recommend award of the Base Bid, Alternate 1 and Alternate 2 for Drewry's Brewery
<br />Cleanup, Phase II to Green Demolition, in the amount of $963,600. Funding is available
<br />through PR-00034202.
<br />Page 2of2
<br />
|