My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Amendment No 2 to OEA Design Srvs. Walker Field & Rum Vlg. Proj No. 123-058 – HWC Engineering, Inc.
sbend
>
Public
>
Public Works
>
Board of Works Documents
>
2024
>
Agreements/Contracts/Proposals/Addenda
>
Amendment No 2 to OEA Design Srvs. Walker Field & Rum Vlg. Proj No. 123-058 – HWC Engineering, Inc.
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/23/2024 1:41:09 PM
Creation date
7/23/2024 1:41:07 PM
Metadata
Fields
Template:
Board of Public Works
Document Type
Contracts
Document Date
7/23/2024
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
4
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Page 1 <br />(Exhibit K – (Amendment to Owner-Engineer Agreement) – Attachment 1) <br />EJCDC E-500 Agreement Between Owner and Engineer for Professional Services. <br />Copyright © 2008 National Society of Professional Engineers for EJCDC. All rights reserved. <br /> <br />This is EXHIBIT K, consisting of 2 pages, referred to in <br />and part of the Agreement between Owner and Engineer <br />for Professional Services dated September 12, 2023. <br /> <br />AMENDMENT TO OWNER-ENGINEER AGREEMENT <br />Amendment No. __2__ <br /> <br />1. Background Data: <br /> <br />a. <br /> <br />Effective Date of Owner-Engineer Agreement: <br /> <br />September 12, 2023 <br /> <br />b. <br /> <br />Owner: <br /> <br />Board of Public Works, City of South Bend <br /> <br />c. <br /> <br />Engineer: <br /> <br />HWC Engineering, Inc. <br /> <br />d. <br /> <br />Project: <br /> <br />Walker Field Restroom Connectivity <br /> <br />2. Description of Modifications: <br />a. Engineer shall perform or furnish the following Additional Services: <br />1) Digital Artwork <br />a) HWC will develop digital artwork for the park map feature to be submitted to <br />the contractor during the shop drawing review phase of construction. <br /> <br />b. The Scope of Services currently authorized to be performed by Engineer in <br />accordance with the Agreement and previous amendments, if any, is modified as <br />follows: <br /> <br />c. The responsibilities of Owner are modified as follows: <br /> <br />d. For the Additional Services or the modifications to services set forth above, <br />Owner shall pay Engineer the following additional or modified compensation: <br />• Digital Artwork – Hourly, Not to Exceed $4,000.00 <br /> <br />e. The schedule for rendering services is modified as follows: <br />• To be completed by December 2024 <br /> <br />f. Other portions of the Agreement (including previous amendments, if any) are <br />modified as follows: <br />[List other Attachments, if any] <br /> <br />5. Agreement Summary (Reference only) <br /> a. Original Agreement amount: $91,500.00________ <br /> b. Net change for prior amendments: $212,500.00________ <br /> c. This amendment amount: $4,000.00 (Hourly NTE)_ <br /> d. Adjusted Agreement amount: $308,000.00________
The URL can be used to link to this page
Your browser does not support the video tag.