Laserfiche WebLink
AIA Document G735 – 2021. Copyright © 2021. All rights reserved. “The American Institute of Architects,” “American Institute of <br />Architects,” “AIA,” the AIA Logo, and “AIA Contract Documents” are trademarks of The American Institute of Architects. This draft was <br />produced at 12:02:08 ET on 07/15/2024 under Order No.2114549984 which expires on 07/14/2025, is not for resale, is licensed for one-time <br />use only, and may only be used in accordance with the AIA Contract Documents® Terms of Service. To report copyright violations, e-mail <br />docinfo@aiacontracts.com. User Notes:(1902521176) <br /> 3 <br />§ 6 Insurance and Bonds Required for the Early Release Work:§6.1 The Owner and Construction Manager shall purchase and maintain insurance for the Early Release Work as <br />set forth in the Agreement, unless otherwise indicated below: <br />(Identify any insurance requirements that differ from those stated in the Agreement, such as coverages types, <br />coverage limits, durations for professional liability or other coverages, and other terms and conditions.) <br />The Owner shall provide the required property insurance noted in section B.2.3 of Agreement Exhibit B. <br />§6.2 Other Insurance: <br />In addition to the insurance requirements in the Agreement, the Construction Manager and/or Owner shall carry the <br />following types of insurance: <br />(List below any other insurance coverage to be purchased and maintained by the Construction Manager or Owner <br />for the Early Release Work, not otherwise required by the Agreement, such as pollution insurance, etc.) <br />None. <br />§6.3 The Construction Manager shall provide bonds for the Early Release Work, in accordance with the <br />requirements of the Agreement, unless otherwise indicated below: <br />(Identify any bond requirements that differ from those stated in the Agreement, such as any difference in the penal <br />sum of the bonds.) <br />No change. <br />§7 Other Terms and Conditions for the Early Release Work: <br />All terms and conditions of the Agreement shall apply to the Early Release Work unless otherwise indicated below. <br />(Describe any terms and conditions related to the Early Release Work that differ from the terms and conditions of <br />the Agreement.) <br />The allowances and contingencies included in the Early Release 1: Exhibit 7 List of Allowances and Contingencies. <br />This Authorization is entered into as of the day and year first above written. <br />OWNER (Signature) CONSTRUCTION MANAGER (Signature) <br />« »« » « »« » <br />(Printed name and title) (Printed name and title) <br />July 23, 2024