My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Amendment No 1 to AIA A133 CMc Contract - Four Winds Field Phase I Proj No. 123-046 – Larson Danielson
sbend
>
Public
>
Public Works
>
Board of Works Documents
>
2024
>
Agreements/Contracts/Proposals/Addenda
>
Amendment No 1 to AIA A133 CMc Contract - Four Winds Field Phase I Proj No. 123-046 – Larson Danielson
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/23/2024 1:40:54 PM
Creation date
7/23/2024 1:40:40 PM
Metadata
Fields
Template:
Board of Public Works
Document Type
Contracts
Document Date
7/23/2024
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
41
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
AIA Document G735 – 2021. Copyright © 2021. All rights reserved. “The American Institute of Architects,” “American Institute of <br />Architects,” “AIA,” the AIA Logo, and “AIA Contract Documents” are trademarks of The American Institute of Architects. This draft was <br />produced at 12:02:08 ET on 07/15/2024 under Order No.2114549984 which expires on 07/14/2025, is not for resale, is licensed for one-time <br />use only, and may only be used in accordance with the AIA Contract Documents® Terms of Service. To report copyright violations, e-mail <br />docinfo@aiacontracts.com. User Notes:(1902521176) <br /> 3 <br />§ 6 Insurance and Bonds Required for the Early Release Work:§6.1 The Owner and Construction Manager shall purchase and maintain insurance for the Early Release Work as <br />set forth in the Agreement, unless otherwise indicated below: <br />(Identify any insurance requirements that differ from those stated in the Agreement, such as coverages types, <br />coverage limits, durations for professional liability or other coverages, and other terms and conditions.) <br />The Owner shall provide the required property insurance noted in section B.2.3 of Agreement Exhibit B. <br />§6.2 Other Insurance: <br />In addition to the insurance requirements in the Agreement, the Construction Manager and/or Owner shall carry the <br />following types of insurance: <br />(List below any other insurance coverage to be purchased and maintained by the Construction Manager or Owner <br />for the Early Release Work, not otherwise required by the Agreement, such as pollution insurance, etc.) <br />None. <br />§6.3 The Construction Manager shall provide bonds for the Early Release Work, in accordance with the <br />requirements of the Agreement, unless otherwise indicated below: <br />(Identify any bond requirements that differ from those stated in the Agreement, such as any difference in the penal <br />sum of the bonds.) <br />No change. <br />§7 Other Terms and Conditions for the Early Release Work: <br />All terms and conditions of the Agreement shall apply to the Early Release Work unless otherwise indicated below. <br />(Describe any terms and conditions related to the Early Release Work that differ from the terms and conditions of <br />the Agreement.) <br />The allowances and contingencies included in the Early Release 1: Exhibit 7 List of Allowances and Contingencies. <br />This Authorization is entered into as of the day and year first above written. <br />OWNER (Signature) CONSTRUCTION MANAGER (Signature) <br />« »« » « »« » <br />(Printed name and title) (Printed name and title) <br />July 23, 2024
The URL can be used to link to this page
Your browser does not support the video tag.