My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Request to Advertise & Title Sheet - Walker Field Park Connectivity Proj No. 123-058
sbend
>
Public
>
Public Works
>
Board of Works Documents
>
2024
>
Requests to Advertise
>
Request to Advertise & Title Sheet - Walker Field Park Connectivity Proj No. 123-058
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/23/2024 1:38:21 PM
Creation date
7/23/2024 1:38:18 PM
Metadata
Fields
Template:
Board of Public Works
Document Type
Requests
Document Date
7/23/2024
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
2
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Mayflower Rd.Western Ave. <br />Ave.Ewing <br />Rd.Ireland Miami St.Michigan St.IronwoodLoganBlvd.JeffersonCity LimitsMcKinley Hwy.St. Joseph RiverU.S. 31S.R. 23 <br />S.R. 23 <br />S.R. 2U.S. 20U.S. 31TO BE USED WITH THESE PLANS. <br />CITY OF SOUTH BEND, INDIANA PREVAILING SPECIFICATIONS LATEST EDITION,Pkwy.Bendix Dr.P <br />orta <br />g <br />e Av <br />e. <br />Nimtz <br />F. Jay <br />Ind. E/W Toll Rd.Main St.DATE <br />APPROVED BY BOARD OF PUBLIC WORKS <br />PRESIDENT <br />MEMBER <br />MEMBER <br />ADMINISTRATION AND DESIGN <br />DATE <br />CITY ENGINEER <br />PROFESSIONAL ENGINEER NO. 11900290 <br />DATE <br />N.T.S. <br />Chippewa <br />Fellows St.MEMBER <br />Edison Rd. <br />Corby Blvd. <br />PROJECT AREA <br />PROJECT SEWER WATER TRAFFIC STREET OTHER <br />CITY OF SOUTH BEND, INDIANA <br />DEPARTMENT OF PUBLIC WORKS <br />GertrudeCITY PROJECT NUMBER 123-058 <br />Ewing Street from S. Gertrude Street to the Walker Field Park Entrance. <br />mid block crossing and sidewalk ramp improvements. The project will also include a multi use trail along south side of W. <br />include new sidewalk and curbs, road resurfacing, curb extensions for a parking lane on the North side of W. Ewing Street, <br />The project consists of a road diet along W. Ewing Avenue between S. Walnut Street and Webster Street, which will <br />WALKER FIELD PARK CONNECTIVITY <br />WALKER FIELD PARK <br />RUM VILLAGE <br />www.hwcengineering.com <br />LAFAYETTE - NEW ALBANY - MUNCIE <br />INDIANAPOLIS - TERRE HAUTE <br />PLANS PREPARED FOR: <br />CITY OF SOUTH BEND <br />South Bend, Indiana 46601 <br />227 West Jefferson Boulevard <br />County - City Building, Suite 1400 S, <br />ELIZABETH A. MARADIK <br />JOSEPH R. MOLNAR <br />GARY A. GILOT <br />MURRAY L. MILLER <br />BREANA N. MICOU <br />JOSH GRABIJAS <br />VICE PRESIDENT <br />RECOMMENDED BY CITY STAFF <br />REG IS T E <br />R <br />ED <br />I <br />ND IA N APROFES <br />S <br />IONAL ENGINEERSTATE OF <br />No. <br />SAJIBARG .P AUHSOJ <br />11900290 <br />REBECCA PLANTZ, PE <br />KARA BOYLES, PhD, PE <br />CONSTRUCTION MANAGERKYLE LUDLOW <br />07/15/2024 <br />07/16/2024 <br />07/16/2024 <br />July 23, 2024
The URL can be used to link to this page
Your browser does not support the video tag.