My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Change Order No 1 - Cleveland Rd & Ameritech Dr Intersection Improv. Proj No. 122-049 - Milestone
sbend
>
Public
>
Public Works
>
Board of Works Documents
>
2024
>
Change Orders
>
Change Order No 1 - Cleveland Rd & Ameritech Dr Intersection Improv. Proj No. 122-049 - Milestone
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/23/2024 1:34:11 PM
Creation date
7/23/2024 1:34:08 PM
Metadata
Fields
Template:
Board of Public Works
Document Type
Projects
Document Date
7/23/2024
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
9
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br /> <br /> <br />INTER-OFFICE MEMORANDUM <br /> <br /> DEPARTMENT OF PUBLIC WORKS <br /> DIVISION OF ENGINEERING <br /> <br /> <br />TO: Theresa Heffner, Clerk <br />Board of Public Works <br />FROM: Scott Kreeger, Senior Project Engineer <br />SUBJECT: Change Order #1 - Project No. 122-049 <br />Cleveland Road & Ameritech Drive Intersection Improvements <br />DATE: June 25, 2024 <br />At the start of construction, it was discovered the vertical alignment of Brick Road onto <br />Cleveland Road was not adequate to allow trucks with low beds to properly maneuver <br />onto Cleveland Road. Since the original scope of the project was to expand the edges <br />of the roadway, it was determined the best course of action would be to fully reconstruct <br />the road and properly match the grades. <br /> <br />Additional work included the removal of a stump along Brick Road and the replacement <br />of a TS2 cabinet. <br /> <br />Please see attachments for more details. <br />
The URL can be used to link to this page
Your browser does not support the video tag.