My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Award Bid - 2024 Curb and Sidewalk Program Proj No. 124-009 - Rieth-Riley Construction
sbend
>
Public
>
Public Works
>
Board of Works Documents
>
2024
>
Award Bids
>
Award Bid - 2024 Curb and Sidewalk Program Proj No. 124-009 - Rieth-Riley Construction
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/17/2025 8:44:53 AM
Creation date
7/23/2024 1:29:03 PM
Metadata
Fields
Template:
Board of Public Works
Document Type
Projects
Document Date
7/23/2024
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
29
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
INTER -OFFICE MEMORANDUM <br />DEPARTMENT OF PUBLIC WORKS <br />DIVISION OF ENGINEERING <br />TO: Theresa Heffner, Board Clerk <br />Board of Public Works <br />FROM: Gemma Stanton, Project Engineer <br />SUBJECT: Award Project No. 124-009 (All Divisions) <br />2024 Curb and Sidewalk <br />DATE: July 15, 2024 <br />On July 15, 2024, the Board of Public Works opened and read bids for the above project. I have <br />reviewed them and found the tabulations correct. The bidders are summarized as follows: <br />Premium <br />Concrete <br />Services <br />Milestone <br />Contractors <br />North <br />Owl Creek <br />Construction <br />Rieth-Riley <br />Selge <br />Construction <br />Division 1 <br />$220,966.00 <br />$207,011.50 <br />$210,759.60 <br />$196,497.46 <br />$192,698.60 <br />Division 2 <br />$252,169.00 <br />$246,100.00 <br />$240,822.41 <br />$200,780.20 <br />Division 3 <br />$163,012.00 <br />$180,403.10 <br />$151,497.50 <br />$161,144.49 <br />$157,024.25 <br />Division 4 <br />$73,451.00 <br />$107,139.60 <br />$59,973.75 <br />$68,745.30 <br />$75,002.30 <br />Division 5 <br />$378,938.00 <br />$299,665.20 <br />$291,583.49 <br />$287,278.00 <br />In reviewing the required documentation, I recommend rejection of the lowest bids for Division 3 <br />and Division 4 from Owl Creek Construction. Owl Creek Construction failed to meet the MBE <br />participation goals (2.84% for Division 3 and 2.09% for Division 4) and did not meet the good faith <br />efforts standards to obtain MBE participation. The MBE documentation, including good faith efforts <br />documentation, was not included with the bid. The next lowest bidders on these divisions were able <br />to meet the MBE goal and demonstrate good faith efforts. <br />For the above reasons, I recommend award of the divisions of the 2024 Curb and Sidewalk <br />program to the following lowest responsive and responsible bidders: <br />• Divisions 1, 2, 3, and 5 to Selge Construction <br />• Division 4 to Rieth-Riley <br />Sufficient funds have been appropriated from the Motor Vehicle Highway for each division. Please <br />call with your questions (9083). <br />Enc. Bid Tabulation <br />
The URL can be used to link to this page
Your browser does not support the video tag.