Laserfiche WebLink
Riverview Tower, New Albany, IN <br />Owner <br />General Contractor <br />Size <br />Delivery Method <br />Contract Value <br />Start Date <br />Completion Date <br />Industry Segment <br />Project Scope Summary <br />New Albany Housing Authority <br />Renascent Inc. <br />124,500 square feet / 16 stories <br />Prime <br />$2.15 million <br />July, 2022 <br />January, 2023 <br />Housing <br />Abatement, Structural Demolition, <br />Site Demolition and Restoration <br />Installed site fencing. Performed abatement, removed universal waste and refrigerants. Setup <br />a road closure. Structural demolition was performed by a crane and wrecking ball, high -reach <br />excavators, as well as excavators with hammers and processors. Once foundations, sidewalks <br />and, parking lots were removed, the site was graded, topsoil was placed and the entire site <br />was seeded. <br />Renascent: Experts in Demolition" <br />